The blocks and gooseneck of the jumbo need ().
第1题:
How should cargo tank hatches be protected when the ullage opening is open and the tank NOT gas free?
A.With gooseneck vents
B.With warning signs
C.With flame screens
D.With pressure-vacuum relief valves
第2题:
Which part of a conventional cargo gear rig provides for vertical control and positioning of a boom ________.
A.Cargo whip
B.Gooseneck fitting
C.Spider band
D.Topping lift
第3题:
are essential for the protection of data.
A.Memory
B.Backups
C.Files
D.Blocks
第4题:
Which of the following is not an advantage of block media recovery (BMR)?()
第5题:
The gooseneck is (). Stop using it at once.
第6题:
The fitting that allows a boom to move freely both vertically and laterally is called the ______.
A.swivel
B.lizard
C.spider band
D.gooseneck
第7题:
Regulations require that cargo tanks in which grades B or C liquids are carried must be vented with which of the following ________.
A.Gooseneck vents
B.Flame screens
C.Pressure vacuum relief valves
D.Forced draft blowers
第8题:
[A] blocks [B] strikes [C] puffs [D] cancels
本题考查动词辨析。空格处填入的动词接the view作宾语,而且它与前面的2 down和freezes并列作谓语,其主语都是the snow。作及物动词时,block意为“堵塞,阻塞”,如:to block the road(堵住了道路)。strike意为“撞击,打击,侵袭”,如:The ship struck a rock.(船触礁了。)The area was struck by an outbreak of plague.(这个地区爆发了瘟疫。)puff意为“吸,抽,喷”,如:to puff the cigar/smoke into sb.’s faces(抽雪茄/把烟往别人脸上喷)。cancel意为“取消”。能够和the view搭配的只有[A]block,表示“挡住视线”。
第9题:
Which of the following conclusions is most appropriate to draw to describe why du shows fewer blocks used than df?()
第10题:
弯漆刷()