船舶水手考试

The()(渡船 carries people, cargo, car or truck for short passages.A、oil bargeB、oil shipC、ferryD、barge

题目

The()(渡船 carries people, cargo, car or truck for short passages.

  • A、oil barge
  • B、oil ship
  • C、ferry
  • D、barge
如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Your tow contains a barge carrying carbon tetrachloride.What is NOT required ________.

A.Cargo warning signs on barge

B.Cargo information card on barge

C.Cargo information card in pilothouse

D.Certificated tankerman on towboat


正确答案:D

第2题:

Unless such oil tanker carries crude oil which is not suitable for crude oil washing,the oil tanker shall ______ the system in accordance with the requirements of that Regulation.

A.operate

B.check

C.install

D.overhaul


正确答案:A

第3题:

In the case of new crude oil tankers,the additional ballast permitted shall be carried in cargo tanks only if such tanks have been ______ before departure from an oil unloading port or terminal.

A.inerted

B.crude oil washed

C.diluted

D.cleaned


正确答案:B

第4题:

集装箱船()

  • A、general cargo ship
  • B、container ship
  • C、oil tanker
  • D、ore carrier

正确答案:B

第5题:

The ()(油驳) is a barge carrying oil.

  • A、oil barge
  • B、oil ship
  • C、pilot boat
  • D、barge

正确答案:A

第6题:

Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil ________.

A.The loading dock

B.The midpoint of the barge

C.Within 25 feet of the pump engine

D.Above the forward rake end


正确答案:B

第7题:

材料:

Every new crude oil tanker of 20000 tons deadweight and above shall be fitted with a cargo tank cleaning system using crude oil washing.The Administration shall undertake to ensure that the system fully complies with the requirements of MARPOL within one year after the tanker was first engaged in the trade of carrying crude oil or by the end of the third voyage carrying crude oil suitable for crude oil washing,whichever occurs later.Unless such oil tanker carries crude oil which is not suitable for crude oil washing,the oil tanker shall operate the system in accordance with the requirements of that Regulation.

Every existing crude oil tanker of 40000 tons deadweight and above shall be provided with segregated ballast tanks.Existing crude oil tankers may,in lieu of being provided with segregated ballast tanks,operate with a cargo tank cleaning procedure using crude oil washing unless the crude oil tanker is intended to carry crude oil which is not suitable for crude oil washing.

Existing crude oil tankers may,in lieu of being provided with segregated ballast tanks or operating with a cargo tank cleaning procedure using crude oil washing,operate with dedicated clean ballast tanks in accordance with the provision of Regulation 13A of this Annex for the following period:for crude oil tankers of 70 000 tons deadweight and above,until two years after the date of entry into force of the present Convention;and for crude oil tankers of 40000 tons deadweight and above but below 70 000 tons deadweight,until four years after the date of entry into force of the present Convention.

问题:

A new crude oil tanker of 30000 tons deadweight shall ________.

A.be fitted with crude oil washing system

B.operate dedicated clean ballast tanks

C.be fitted with segregated ballast tanks

D.be fitted with washing system other than crude oil washing system

Except________,the existing crude oil tankers may operate with any of the following installations.A.segregated ballast tanks

B.cargo tank cleaning procedure using crude oil washing

C.operate with dedicated clean ballast tanks

D.protection position

The latest date for an existing crude oil tanker of 60000 tons deadweight to install dedicated clean ballast tanks is ________.A.until two years after the date of entry into force of the present Convention

B.until four years after the date of entry into force of the present Convention

C.within one year after the tanker was first engaged in the trade of carrying crude oil

D.by the end of the third voyage carrying crude oil

It is inferred that ________.A.all oil tankers,both the newly built and existing ones,shall be fitted with a cargo tank cleaning system using crude oil washing

B.a new crude oil tanker of 20 000 tons deadweight and above may,in lieu of being provided with crude oil washing system,operate with segregated ballast tanks

C.a new crude oil tanker of 20 000 tons deadweight and above may,in lieu of being provided with crude oil washing system,operate with dedicated clean ballast tanks

D.a new crude oil tanker of 20 000 tons deadweight and above shall not be fitted with a cargo tank cleaning system using crude oil washing immediately after her entry in the trade of carrying crude oil

请帮忙给出每个问题的正确答案和分析,谢谢!


问题 1 答案解析:A


问题 2 答案解析:D


问题 3 答案解析:B


问题 4 答案解析:D

第8题:

The port State control officer will ensure that ______ is performed by all crude carriers either required to have a crude oil washing system or where the owner or operator chooses to install a crude oil washing system.

A.cargo loading operations

B.cargo unloading operations

C.cargo control operations in the transport

D.crude oil washing


正确答案:D

第9题:

The()(液货船) includes oil tanker, VLCC, LNG ,etc.

  • A、chemica lcarrier
  • B、tanker
  • C、refrigerator
  • D、barge

正确答案:B

第10题:

The()takes a pilot to an oceangoing ship.

  • A、container ship
  • B、oil ship
  • C、pilot boat
  • D、barge

正确答案:C

更多相关问题