A network planning diagram shows a large internetwork with many routers. The configurations show that OSPF has been enabled on all interfaces, I P addresses correctly configured, and OSPF workinG. For which of the following cases would you expect a route

题目

A network planning diagram shows a large internetwork with many routers. The configurations show that OSPF has been enabled on all interfaces, I P addresses correctly configured, and OSPF workinG. For which of the following cases would you expect a router to create and flood a Type 2 LSA?()

  • A、When OSPF is enabled on a LAN interface, and the router is the only router connected to the subnet.
  • B、  When OSPF is enabled on a point - to -point serial link, and that router has both the higher router ID and higher interface IP address on the link.
  • C、When OSPF is enabled on a Frame Relay point - to - point subinterface, has the lower RID and lower subinterfa ce IP address, and otherwise uses default OSPF configuration on the interface.
  • D、When OSPF is enabled on a working LAN interface on a router, and the router has been elected BDR.
  • E、None of the other answers is correct.
如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

● (73) is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist between

them.

(73)

A.PERT

B.AOA

C.WBS

D.PDM


正确答案:D

试题(73)分析
    (73)  用于关键路径法,是用于编制项目进度网络图的一种方法,它使用方框或者长方形(被称作节点)代表活动,它们之间用箭头连接,显示彼此之间存在的逻辑关系。
  A.PERT            B.AOA             C.WBS             D.PDM
参考答案
  (73)D

第2题:

is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles,referred to as nodes,to represent activities and connects them with arrows that show the logical relationships that exist between them. A.PERT B.AOA C.WBS D.PDM


正确答案:D
前导图法(PDM)用于关键路径法,是用于编制项目进度网络图的一种方法,它使用方框或者长方形(被称做节点)代表活动,它们之间用箭头连接,显示它们彼此之间存在的逻辑关系。

第3题:

The purpose of a dummy activity in an activity-on-arrow diagram is to:

A.Identify a task that could be replaced by another.

B.Take the slack time into account.

C.Show a task that is not necessarily needed.

D.Denote a milestone.

E.Show a dependency relationship.


正确答案:E
E

第4题:

is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist between them.

A.PERT

B.AOA

C.WBS

D.PDM


正确答案:D

第5题:

A technician would use a physical network diagram to determine:()

A. the cause of routing errors.

B. the number of switches on the network.

C. the number of users on the network.

D. where network latency will occur.


参考答案:B

第6题:

is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the dependencies.This method includes following types of dependencies or precedence relationships:(67), the initiation of the successor activity, depends upon the completion of the predecessor activity.(68), the initiation of the successor activity, depends upon the initiation of the predecessor activity.

A.PDM

B.CPM

C.PERT

D.AOA


正确答案:A
解析:PDM是以一种方块或矩形(或称为节点)来表示活动,并将它们用表示依存关系的箭线连接起来,以构建项目进度网络图的方法。这种方法包括了下列依存或前导关系:完成—开始(F-S),后续活动的开始依赖于前置活动的完成。开始-开始(S-S),后续活动的开始依赖于前置活动的启动。

第7题:

Which IOS user EXEC command will allow a network technician to determine which router in the path to an unreachable network host should be examined more closely for the cause of the network failure?

A. EzonexamB> telnet

B. EzonexamB > ping

C. EzonexamB > trace

D. EzonexamB > show ip route

E. EzonexamB > show interface

F. EzonexamB > show cdp neighbors


正确答案:C
C 解析:Explanation:
This can perform. the trace command. It sends the ping packets to each of the routers on the way to the receiver. The router which doesn't respond will be a potential failure place in this network.

第8题:

● The purpose of a dummy activity in an activity-on-arrow diagram is to:

A Identify a task that could be replaced by another.

B Take the slack time into account.

C Show a task that is not necessarily needed.

D Denote a milestone.

E Show a dependency relationship.


正确答案:E

第9题:

the following diagram is() network topology structure

A.bus

B.star

C.ring

D.tree


正确答案:A
解析:下面的图表是()网络拓扑结构A、总线型B、星型C、环型D、树型

第10题:

During planning you sit down and estimate the time needed for each task and total them to come up with the project estimate This duration is what you commit to complete the project. What is wrong with the scenario? ()

A.The team did not create the estimate and estimating tales too long using that method

B.The team did not create the estimate and a network diagram was not used

C.The estimate is too long and should be created by management

D.The project estimate should be the same as the customer's required completion date


正确答案:B