Performing()involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.A、qualityplanningB、qualityassuranceC、qualityperformanceD、quality contr

题目

Performing()involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.

  • A、qualityplanning
  • B、qualityassurance
  • C、qualityperformance
  • D、quality control
如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

113 Risk mitigation involves all but which of the following:

A. developing system standards (policies, procedure, responsibility standards)

B. obtaining insurance against loss

C. identification of project risks

D. performing contingent planning

E. developing planning alternatives


正确答案:C

第2题:

Performing( )involves monitoring specific project results to determine ifthey comply with relevant quality standards and identifying ways to eliminate causes ofunsatisfactory results。 A.quality planning B.quality assurance C.quality performance D.quality control


正确答案:D
执行质量控制(quality control)指监控具体的项目结果,确定其是否符合相关的质量标准,并判断如何杜绝造成不合格结果的根源。

第3题:

● Performing (74) involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.

(74)

A. quality planning

B. quality assurance

C. quality performance

D. quality control


正确答案:D

第4题:

● Perform Quality Control is the process of monitoring and recording results of executing the Quality Plan activities to assess performance and recommend necessary changes.(74) are the techniques and tools in performing quality control.

Statistical sampling ① Run chart ②

Control charts ③ Critical Path Method ④

Pareto chart ⑤ Cause and effect diagrams ⑥

(74)

A.①②③④

B.②③④⑤

C.①②③⑤⑥

D.①③④⑤⑥


正确答案:C
试题(74)分析
实现项目质量控制的方法、技术和工具包括统计抽样Statistical sampling,运行图Run chart、控制图Control charts、帕累托图Pareto chart,以及因果图Cause and effect diagrams等。
关键路径法Critical Path Method是制定项目进度计划的方法,因此选C
参考答案
(74)C

 

第5题:

Performing(74)involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.

A.quality planning

B.quality assurance

C.quality performance

D.quality control


正确答案:D
解析:执行质量控制指监控具体的项目结果,确定其是否符合相关的质量标准,并判断如何杜绝造成不合格结果的根源。

第6题:

involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it,and can be within the same or in another application area.

A.Metrics

B.Measurement

C.Benchmarking

D.Baseline


正确答案:C
解析:基准分析涉及到将实际或计划的项目实践与其他项目进行比较,以产生改进的思想并提供一个测量绩效的基准。其他项目可以是执行组织内部的,也可以是外部的,可以是同一个应用领域的,也可以是其他应用领域的。

第7题:

Perform. Quality Control is the process of monitoring and recording resuks of executing the Quality Plan activities to assess performance and recommend necessary changes.( )are the techniques and tools in performing quality control. ①Activity network diagram②Cause and effect diagrams③Inspection④Flow chart⑤Work Breakdown Structure⑥Pareto chart A.①③⑤ B.②④⑤⑥ C.②③④⑤⑥ D.①②③④⑥


正确答案:D
执行质量控制是一个监督、评价项目质量计划活动执行结果和提出变更请求的过程。执行质量控制的技术和工具包括:活动网络图(Activity network diagram)、因果图(Cause and effect diagrams)、检查(Inspection)、流程图(Flow chart)和帕累托图(Pareto chart)等,但不包括工作分解结构(Work Breakdown Structure)。

第8题:

Risk mitigation involves all but which of the following:

A developing system standards (policies, procedure, responsibility standards)

B obtaining insurance against loss

C identification of project risks

D performing contingent planning

E developing planning alternatives


正确答案:C

第9题:

Associated transfer involves words used in their figurative sense.()


参考答案:正确

第10题:

( )contributes to monitoring and data collection by defining security monitoring and data collection requirements.

A.information continuity management
B.information catalogue management
C.information security management
D.information distribution management

答案:B
解析:

更多相关问题