IBM认证考试

A customer is looking to add disk storage. They are not satisfied with their existing EMCCLARiiON CX4-240. Instead of adding storage to the CX4, the customer wants to add a newsystem and migrate the LUNs from the EMC to the new storage system over a 6 mon

题目

A customer is looking to add disk storage. They are not satisfied with their existing EMCCLARiiON CX4-240. Instead of adding storage to the CX4, the customer wants to add a newsystem and migrate the LUNs from the EMC to the new storage system over a 6 month period,and not have any system disruption during this time. They are also interested in consolidating diskstorage management. Given these specifications, which of the following solutions would satisfythis customer’s requirements?()

  • A、DS5100 and SAN Volume Controller
  • B、DS5100 and Tivoli Storage Manager
  • C、2 DS5100 systems with Remote Mirroring
  • D、DS5100 and Tivoli Storage Productivity Center for Data
如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer has an IBM System Storage Enterprise Storage Server and several EMC CX3 systems installed in a data center, attached to IBM System p servers. As a step toward data consolidation, they intend to put all data on a new DS8700.  What would be the most important data migration factors to consider()

  • A、sector size and the amount of production data
  • B、existing RAID levels and the disk drive speed
  • C、sector size and existing RAID levels
  • D、amount of production data and the disk drive speed

正确答案:D

第2题:

An IBM Business Partner suggests an IBM System Storage DS8000 to a customer with a SAN   that is now configured with an EMC Symmetrix subsystem disk.  The customer wants to determine if new HBAs and software upgrades are needed on the servers if the EMC storage is replaced by the DS8000 What document must be carefully read to help address the customer’s concerns()

  • A、IBM System Storage DS8000: Host Systems Attachment Guide
  • B、DS8000 Interoperability Matrix
  • C、IBM System Storage DS8000: Introduction and Planning Guide
  • D、IBM System Storage Solution Handbook

正确答案:B

第3题:

A customer has installed an IBM System Storage DS8700 with 20 TB of storage, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues since they have added new workloads. The customer asks the storage specialist for guidance.Which of the following actions should be recommended as a first step?()

A. install the Performance Accelerator feature

B. review the DS Storage Manager Major Event Log (MEL)

C. add an expansion frame with additionalFibre Channel ports

D. review the latest TPC for Disk study to identify the source of the performance issue


参考答案:D

第4题:

A customer server has the maximum local storage installed. The customer plans to share this new storage with other servers. Which of the following provides that server additional storage?()

  • A、Add External Storage via EXP3000
  • B、Replace current storage with more dense drives
  • C、Add External Storage via SAN
  • D、Add storage expansion blade

正确答案:C

第5题:

A customer has an existing DS5300 system attached to two Brocade switches with eight Windowsservers. The customer wants to add their System i p750 server to this SAN. From the followingchoices what is the simplest and least expensive solution for this customer?()

  • A、add twofibre HBAs to the System i and connect to the SAN
  • B、add twofibre HBAs to the System i and connect to the Windows Servers
  • C、add twofibre HBAs to the System i and connect to the System i using VIOS
  • D、add two SAS HBAs to the Systemi array and connect directly to the DS5300

正确答案:A

第6题:

A customer wants to migrate their existing cluster onto new POWER6 hardware, and in addition requires thecluster to be migrated from PowerHA version 5.3 to 5.5. Given that AIX 6.1 and PowerHA 5.5 filesets arealready installed in the new hardware, which of the following methods would allow the customer to maintaintheir current cluster configuration?()

  • A、Add the new nodes to the existing cluster, and perform a rolling migration and remove the original nodesfrom the cluster
  • B、Add the new nodes to the existing cluster, and perform a non-disruptive upgrade and remove the originalnodes from the cluster.
  • C、Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Start cluster serviceson the new cluster and stop the original cluster
  • D、Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Stop cluster serviceson the original cluster and start on the new cluster

正确答案:D

第7题:

A customer wants to add a new application to their existing IBM System Storage DS5300. Theyexpect that the new application will require a minimum of 15,000 additional IOPS. What toolshould be used to determine what additional disk is required to effectively add the newapplication?()

  • A、eConfig
  • B、Disk Magic
  • C、Capacity Magic
  • D、Tivoli Storage Productivity Center for Data

正确答案:B

第8题:

The customer has recently installed a pSeries p5-570 with EMC attached disk storage.  After installation, the customer complained that the disk access appeared to be too slow.  How should the pSeries technical specialist best assist the customer?()

  • A、Recommend the customer call EMC.
  • B、Recommend the customer call IBM hardware support.
  • C、Recommend the customer contact SupportLine.
  • D、Recommend the customer re-creates the volume groups.

正确答案:C

第9题:

A customer wants to integrate an x445 running SuSE with their existing EMC storage infrastructure.  Which of the following tasks needs to be done to ensure that the solution will work properly?()

  • A、Ensure that the EMC storage is listed on the IBM Server Proven website
  • B、Ensure that the x445 is listed on the EMC Hardware Compatibility website
  • C、Ensure that the x445 and the EMC storage server are listed on Novell’s SuSE Supported Hardware website
  • D、Build a proof of concept system at the customer site to demonstrate functionality

正确答案:A

第10题:

A customer has installed an IBM System Storage DS8700 with 20 TB of storage, two-way processor version, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues.  To address this performance consideration with minimal cost to the customer, which of the following should be the FIRST step to resolve the problem()

  • A、add an expansion frame with additionalFibre Channel ports
  • B、increase the amount of storage by 20 TB
  • C、conduct a Disk Magic study to identify the source of the performance issue
  • D、add additionalFibre Channel ports to the existing DS8700

正确答案:C

更多相关问题