IBM认证考试

A customer needs a new database server.  The database application has a high memory overhead but does not benefit from 8-way processing.  They would like a rack mountable system, which will support four Xeon processors with 512KB of L2 cache and 16GB of m

题目

A customer needs a new database server.  The database application has a high memory overhead but does not benefit from 8-way processing.  They would like a rack mountable system, which will support four Xeon processors with 512KB of L2 cache and 16GB of main system memory.  Which of the following will satisfy the customer’s requirements?()

  • A、x445 with four Xeon DP processors and 16GB of memory in a single SMP module
  • B、x445 with four Xeon MP processors and 16GB of memory in a single SMP module
  • C、x445 with two SMP modules each containing two Xeon DP processors and 8GB of memory
  • D、x445 with two SMP modules each containing two Xeon MP processors and 8GB of memory
如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A company wants to replace an existing UNIX database server with a new application running on Microsoft SQL Server.  Sizing analysis shows that a system with at least eight Xeon MP processors and 24GB RAM will be required for the central database server. Which of the following will meet the requirements at the lowest cost?()

  • A、8-way x445 with Microsoft Windows Server 2003 Standard Edition
  • B、8-way x445 with Microsoft Windows Server 2003 Datacenter Edition
  • C、8-way x445 with Microsoft Windows Server 2003 Enterprise Edition
  • D、16-way x445 with VMWare ESX with SMP and Windows Server 2003 Standard Edition VMs

正确答案:C

第2题:

An administrator has added a new device to a system and wants to determine if it has been correctly added to the ODM database. Which command would the system administrator use?()

  • A、odmget
  • B、odmadd
  • C、odmshow
  • D、odmcreate

正确答案:A

第3题:

Which three tasks can be performed using a duplicate database?()

A. Testing the backup and recovery procedures

B. Testing the upgrade of an Oracle database to a new release

C. Testing the effect of an application changes on database performance

D. Continuously updating archive log files from the target database to support failover


参考答案:A, B, C

第4题:

An administrator has ordered a new server and setup a dedicated RAID 1 array for the application database. While troubleshooting with performance monitoring tools, the administrator is receiving lowerread/write speeds than expected.  Which of the following would be the MOST likely cause for the lower performance?()

  • A、 The BIOS needs to be upgraded.
  • B、 The administrator did not add the right amount of memory.
  • C、 There is a cooling issue with the server.
  • D、 The administrator did not order high enough RPM drives.

正确答案:D

第5题:

A customer has an 8-way p650 running an application for about 200 users.  In the past, the requiredamount of memory and processors has increased proportionally to the number of new users.  The customer plans to increase users by 10% each year for the next three years.  Next year, a database will be added to the workload to support the users directly rather than being on a separate machine. What is the most likely result of this projected growth?()

  • A、Disk usage will increase in proportion to memory.
  • B、The new database will demand much more memory.
  • C、Memory demand will increase 10% for the next year.
  • D、Processor demand will increase about 10% for the next year.

正确答案:B

第6题:

A customer has a requirement for a server to run Windows Server 2003 Enterprise Edition and Exchange 2003 Enterprise Edition. It has been determined that 4GB RAM will be needed.  The customer is trying to decide between the two following configurations:   (1)An IBM xSeries x366 with 4 Xeon MP processors and 4 x 1GB memory DIMMs.       (2)An IBM xSeries x445 with 4 Xeon MP processors and 8 x 1GB memory DIMMs.  Which question should be asked to guide the customer in selecting the correct memory configuration?()

  • A、Is rack space an issue?
  • B、Is there a high cache-hit ratio?
  • C、Is this a mission-critical application?
  • D、Are there plans to expand the memory to 8GB in the future?

正确答案:C

第7题:

A mechanical contractor is deploying a custom application written to take advantage of multithreading features and run in a Windows environment. The customer has read about iDataPlex, BladeCenter, and System x servers. The customer wants to know which processor family will run the application most efficiently. Which of the following questions will provide the required information?()

  • A、Can the application use Hot Swap Processor, Memory, and PCI-X technology? 
  • B、Will the application benefit from larger disk cache and swap space? 
  • C、Will the application run faster with Microsoft OLTP technology? 
  • D、What is the application's maximum processor scaling capability?

正确答案:B

第8题:

A customer has a p650 with a write-intensive database application.  Recently the order entry team has complained about unusually slow response times. There have been no complaints from any other departments.  Which of the following actions would most likely address the problem?()

  • A、Double the number of processors.
  • B、Double the number of memory DIMMs.
  • C、Double the number of network adapters.
  • D、Double the number of SCSI buses and disks.

正确答案:D

第9题:

A customer needs a solution that provides a total of eight processors (four active and four inactive), 16GB of memory, Advanced POWER Virtualization, and the ability to grow.  Which of the followingsystems should the pSeries technical specialist propose?()

  • A、p650
  • B、p5-570
  • C、Two p630s
  • D、p5-570 Express

正确答案:B

第10题:

A company would like to upgrade an old server to a multi-processor box. The server currently has asingle 3.0GHz 1Mb cache processor in it with a single empty socket. The only processor that is available from a manufacturer is a 3.0GHz 2Mb cache model.  Which of the following is the BEST reason why this upgrade will not work?()

  • A、 The socket size does not match
  • B、 The cache is from a different manufacturer
  • C、 The processors do not match
  • D、 Processors cannot be upgraded after server has been deployed

正确答案:C

更多相关问题