IBM认证考试

Which of the following tools can be used to schedule a backup operation that is to be run every Sunday evening?()A、JournalB、Task CenterC、Activity MonitorD、Command Line Processor

题目

Which of the following tools can be used to schedule a backup operation that is to be run every Sunday evening?()

  • A、Journal
  • B、Task Center
  • C、Activity Monitor
  • D、Command Line Processor
如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A server failed Thursday evening before the nightly backup. The backup scheme in place was full backups every Sunday, incremental backups on Monday, Wednesday, and Friday, and differential backups on Tuesday,Thursday, and Saturday. To fully restore the server.which of the following is the LEAST amount of backup sets required?()

A. One

B. Two

C. Three

D. Four


参考答案:C

第2题:

You are the network administrator for All network servers run Windows Server 2003.A member server named TESTKING1 hosts several hundred folders, which residein various locations on the server. TESTKING1 is configured to run a normalbackup of the folder every Saturday at 1:00 A.M.You discover that users edit the contents of the folders on Saturday and Sunday.You need to use the Backup utility to reschedule the backup job so that it runs everyMonday at 1:00 A.M. instead of every Saturday at 1:00 A.M. You must achieve thisgoal by using the minimum amount of administrative effort.What should you do?()

A. Specify Monday as the start date of the job.

B. Reconfigure the job schedule to run the backup every Monday at 1:00 a.m.

C. Add an additional schedule to the job. Configure the additional schedule to run the backup on Monday at 1:00 a.m.

D. Use the Repeat Task option to configure the existing job to repeat every 48 hours until an interval of 336 hours passes.


参考答案:B

第3题:

Which of the following command line tools can be used to display the default gateway, IP address,and DNS servers currently being used by a host?()

A.TRACERT

B.IPCONFIG/ALL

C.NSLOOKUP

D.PING-T


参考答案:B

第4题:

Which of the following tools can be used prior to installing Windows Vista to find hardware compatibility issues?()

  • A、Upgrade Advisor
  • B、Window Aero
  • C、Task Manager
  • D、Device Manager

正确答案:A

第5题:

You are the network administrator for All servers run Windows Server 2003. You are creating a backup schedule for the main file server. You need to create a schedule so that backup jobs are completed in the shortest amount of time possible. What should you do?()

  • A、Schedule a normal backup every Sunday. Schedule incremental backups every Monday through Saturday.
  • B、Schedule a normal backup every Sunday. Schedule differential backups every Monday through Saturday.
  • C、Schedule a copy backup every day.
  • D、Schedule a normal backup every day.

正确答案:A

第6题:

Which of the following tools can be used to schedule a backup operation that is to be run every Sunday evening?()

A.Journal

B.Task Center

C.Activity Monitor

D.Command Line Processor


参考答案:B

第7题:

A user reports that it takes a long time to boot up in Windows XP and that there are a lot of icons appearing in the right lower side of the Task Bar. Which of the following tools can be used to minimize startup time? ()

  • A、MSCONFIG
  • B、SCANDISK
  • C、DEBUG
  • D、DEFRAG

正确答案:A

第8题:

Which of the following tools can be used prior to installing Windows Vista to find hardware compatibility issues?()

A. Upgrade Advisor

B. Window Aero

C. Task Manager

D. Device Manager


参考答案:A

第9题:

A server failed Thursday evening before the nightly backup. The backup scheme in place was fullbackups  every Sunday,incremental backups on Monday,Wednesday,and Friday,and differentialbackups on Tuesday,Thursday,and Saturday.  To fully restore the server,which of the following is theLEAST amount of backup sets required?()

  • A、 One
  • B、 Two
  • C、 Three
  • D、 Four

正确答案:C

第10题:

Which of the following tools can an administrator use to get a server baseline?()

  • A、System Resource Monitor
  • B、Microsoft Baseline Security Analyzer (MBSA)
  • C、Replication Monitor
  • D、Performance Monitor

正确答案:D

更多相关问题