Customer purchased and x3650 M3 server and requires the ability to remotely power on and off the server. What if any additional hardware would the customer need to purchase to remotely power the server on and off?()
第1题:
A customer purchased a new PC with Windows XP but wants to run a program designed forWindows 98. Which of the following will allow this program to run under Windows XP?()
第2题:
A customer has purchased three IBM System Storage DS8300 systems and would like to have their SAN and storage administrator trained. The customer is worried about having much of their staff out of the office at the same time attending courses. Which training alternative provides the necessary training with the least impact()
第3题:
A current Sun Solaris customer has just purchased their first p5 590. During the Solution Assurance, the backup requirements were discussed. Which of the following should be recommended to the customer with regards to restoring rootvg?()
第4题:
During the pre-installation planning of a customer’s recently purchased IBM System Storage DS8700 the port configuration, cabling, and disk layout were discussed. What other topic should be discussed in this solution review()
第5题:
A distribution customer requires a fault-tolerant disk subsystem for their x3650 M2 server. They purchased and attached two EXP3000 External Expansion Enclosures to a ServerRAID MR10M RAID controller. The customer requires the highest performance possible, regardless of cost for the EXP-based drives. Which RAID level meets these requirements?()
第6题:
A customer is experiencing problems with a failed disk drive on their newly purchased p630 server. The IBM CE has replaced the disk and now the mirrored Logical Volume needs to be re-created. The customer does not have the skills to do this. There is no support contract with the solution provider but the p630 is covered under a Software Maintenance Agreement (SWMA) 24/7 contract. What should the pSeries technical specialist do first?()
第7题:
A p5 570 12 way was purchased with the plan to install six LPARs running AIX 5.2. The machine has 12 disks spread evenly over the internal server drawers. The customer would now like to add a seventh LPAR. Which of the following should be added for the seventh LPAR boot device?()
第8题:
A customer recently purchased an HS22 Blade to install into their existing BCH chassis. The customer installed the blade and it was not recognized. Which ofthe following is the first question for this customer?()
第9题:
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()
第10题:
Companycom purchased a p5 570 with no plans to partition. The customer plans to use the ASMI interface to power on and off the machine. How can ASMI be accessed without a HMC?()