题目

In which phase should a TDA be performed of the following?()

  • A、Server deployment
  • B、Installation and server configuration
  • C、Problem determination / resolution
  • D、Needs analysis and design
参考答案和解析
正确答案:D
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Typically, during which phase in a project life cycle are most of the project expenses incurred.

A . Concept phase

B . Development of design phase

C . Execution phase.

D . Termination phase.

E . None of the above


正确答案:C

第2题:

141 Feasibility studies occur in which life cycle phase (s)?

A. Conceptual

B. Conceptual or Development

C. Execution

D. Preliminary planning

E. any life cycle phase


正确答案:A

第3题:

Which of the following are included in the Acquisition phase(s) of the project life cycle.

A . concept and development

B . development and planning

C . execution and phase-out

D . planning and implementation

E . concept and planning


正确答案:C

第4题:

● Feasibility studies occur in which life cycle phase (s)?

A Conceptual

B Conceptual or Development

C Execution

D Preliminary planning

E any life cycle phase


正确答案:A

第5题:

88 Typically, during which phase in a project life cycle are most of the project expenses incurred. A. Concept phase

B. Development of design phase

C. Execution phase.

D. Termination phase.

E. None of the above


正确答案:C

第6题:

During which phase of the project life cycle is the amount at stake lowest?

A concept

B development

C execution

D conclusion

E C and D


正确答案:A

第7题:

6 Typically, during which phase in a project life cycle are most of the project expenses incurred. A. Concept phase

B Development of design phase

C. Execution phase.

D. Termination phase.

E. None of the above


正确答案:C

第8题:

Feasibility studies occur in which life cycle phase (s)?

A.Conceptual

B.Conceptual or Development

C.Execution

D.Preliminary planning

E.any life cycle phase


正确答案:A
A

第9题:

82 Which of the following are included in the Acquisition phase(s) of the project life cycle.

A. concept and development

B. development and planning

C. execution and phase-out

D. planning and implementation

E. concept and planning


正确答案:C

第10题:

●In which phase of the software engineering process is the Software Requirements Specification developed? (68) .

(68) A.development phase

B.engineering phase

C.maintenance phase

D.Definition phase


正确答案:D
【解析】软件需求说明在软件开发的哪个周期阶段出来?

更多相关问题