Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on

题目

Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated. Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()

  • A、Dynamic LPAR
  • B、Workload Manager
  • C、Partition Load Manager
  • D、Shared Processor Pools
如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A solution for two batch applications was proposed in Companycom meeting. They are currently running in two LPARs on a p690. On a daily basis, both applications use 15% of the machine for their workload, and increase to 100% when their weekly reports are run. Since the reports are not run on the same day, what is the best solution?()

  • A、COD
  • B、DLPAR
  • C、One big LPAR
  • D、Two separate p690 machines

正确答案:B

第2题:

Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()

  • A、VIO Server
  • B、AIX 5.2 ML4
  • C、Shared Ethernet Adapter
  • D、AIX 5.3 with Advanced Power Virtualization

正确答案:D

第3题:

The project life-cycle can be described as(72). A.project concept,project plannin9,project execution,and project close-out B.project planning,work authorization,and project reporting C.project planning,project control,project definition,WBS development,and project termination D.project concept,project execution,and project reporting


正确答案:A
项目的生命周期可以被描述为项目启动、项目计划,项目实施和项目收尾。

第4题:

Companycom is considering a partitioned solution with one of the LPARs utilizing 12 CPUs. Multiple applications will be loaded on this large LPAR. However, the customer wants to ensure some tasks will have higher priority access to the CPU and memory resources. Which of the following solutions would best satisfy the requirement?()

  • A、Loadleveler
  • B、AIX Workload Manager
  • C、Partition Load Manager
  • D、Tivoli Provisioning Manager

正确答案:B

第5题:

Companycom is planning for a 64-way p5 595. The plan is to use Virtual IO Servers and micropartitioning. What is the maximum number of partitions they can allocate?()

  • A、128
  • B、254
  • C、320
  • D、640

正确答案:B

第6题:

Companycom has restored their mksysb. They notice that the external volume groups cannot be seen. What should be done to access the volume groups?()

  • A、Run importvg command
  • B、Run synclvodm command
  • C、Recreate volume groups
  • D、Update /etc/filesystems

正确答案:A

第7题:

After rebooting the machine, Companycom notices that the machine is not performing as well as before. The applications are running slower, and their CPU utilization has increased. How can the customer check to see if a CPU was deallocated?()

  • A、Run the vmstat command
  • B、Run the iostat command
  • C、Run the lparstat command
  • D、Check the logs in the /var/adm/ras directory

正确答案:C

第8题:

Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()

  • A、The resources must be unallocated in an LPAR
  • B、The microcode on the pSeries must be current
  • C、All network adapters on the LPAR must be defined
  • D、Network connectivity and name resolution capability between HMC and LPARs

正确答案:D

第9题:

Companycom has plans to deploy a large database solution. Their primary requirement is minimal user access downtime. They are comparing a single server implementation with a two server deployment. What solution would they use to avoid downtime for OS software maintenance?()

  • A、Apply OS updates once a year
  • B、Utilize a GPFS cluster solution
  • C、Implement a two server deployment with HACMP
  • D、Install a single server implementation with HACMP failover to a second LPAR

正确答案:C

第10题:

While planning the logical volume design of a new install, Companycom considered using a striped logical volume for performance. They want to be able to extend the logical volume in the future. Which of the following actions will provide this capability?()

  • A、Add additional logical volumes two at a time
  • B、Add additional physical volumes two at a time
  • C、Create a columned striped logical volume using -C option of mklv
  • D、Create an extendable striped logical volume using -E option of mklv

正确答案:C