IBM认证考试

A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()A、JS21B、JS23C、PS700D、PS701

题目

A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()

  • A、JS21
  • B、JS23
  • C、PS700
  • D、PS701
参考答案和解析
正确答案:C
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer recently purchased an HS22 Blade to install into their existing BCH chassis. The customer installed the blade and it was not recognized. Which ofthe following is the first question for this customer?()

  • A、Did you add the redundant AMM?
  • B、What is the processor wattage?
  • C、Is the AMM firmware up to date?
  • D、Is the HS22V memory configuration optimized?

正确答案:C

第2题:

Which of the following would be an advantage to using a blade(刀片) server(服务器) as opposed to a rack(机架式) mount server?()

  • A、 Blade servers allow for internal tape drives
  • B、 Blade servers offer more rack density
  • C、 Blade servers are typically faster
  • D、 Blade servers allow for more RAM

正确答案:B

第3题:

Which of the following would be an advantage to using a blade server as opposed to a rack mount server?()

A. Blade servers allow for internal tape drives

B. Blade servers offer more rack density

C. Blade servers are typically faster

D. Blade servers allow for more RAM


参考答案:B

第4题:

A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()

  • A、An IBM BladeCenter H chassis for the JS22 Blade servers
  • B、A concurrent KVM daughter card
  • C、A pair of IBM BladeCenter Power Supplies
  • D、A second Management Module

正确答案:C

第5题:

A blade server has been configured to boot from SAN.  After an HBA firmware upgrade the blade was rebooted and cannot find the operating system.  Which of the following should the administrator do NEXT to troubleshoot the issue?()

  • A、Verify all HBA settings.
  • B、Upgrade the blade firmware.
  • C、Upgrade the OS level HBA drivers.
  • D、Set the system to boot from the local disk.

正确答案:A

第6题:

Which blade of the ucs solution is best able to accommodate the resource requirements of virtual machine growth?()

  • A、UCS B250 M1 (EXPANDED MERNORY Blade Server)
  • B、UCS B200 M1 (Half-width Blade Server)
  • C、UCS 2100 IOM (IO Module)
  • D、UCS VIC M81KR (Virtual CNA)

正确答案:A

第7题:

Which of the following is the MOST space efficient server chassis type within a server rack?()

  • A、 Tower server
  • B、 Bare metal server
  • C、 Blade server
  • D、 Rack server

正确答案:C

第8题:

A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server.Which limitation must be considered when planning the system configuration?()

A.A VIO server requires a dedicated LHEA port.

B.There is a limit of 32 LPARs per virtual LAN.

C.Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.

D.Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.


参考答案:A

第9题:

A customer server has the maximum local storage installed. The customer plans to share this new storage with other servers. Which of the following provides that server additional storage?()

  • A、Add External Storage via EXP3000
  • B、Replace current storage with more dense drives
  • C、Add External Storage via SAN
  • D、Add storage expansion blade

正确答案:C

第10题:

An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads. Which Blade is designed for Windows workloads?()

  • A、HS22
  • B、JS43
  • C、QS21
  • D、PS701

正确答案:A

更多相关问题