IBM System p 的高可靠性软件是()
第1题:
A bank has requested proposals for a storage solution to implement disaster recovery processes for their IBM System z configured with Linux, IBM System p configured with AIX, and Microsoft Windows environments. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, and FlashCopy. Floor space is limited. What hardware platform provides this native support?()
第2题:
Which of the following tools can be used to configure the IBM System Storage DS8000? ()
第3题:
A. IBM Systems Director
B. Unisphere Management Suite
C. IBM System Storage Productivity Center (SSPC)
D. IBM Standalone Solutions Configuration Tool (SSCT)
第4题:
A sales team has proposed an IBM System Storage DS8100 configured with 10 TB, split equallybetween IBM System z and IBM System p. The System z environment requires point-in-time copyand the System p environment does not. For the System z environment, 3 TB have beenconfigured with an additional 2 TB for point-in-time copy. What is the least expensive licensescope for point-in-time copy?()
第5题:
A customer wants to consolidate storage from four IBM System p servers and one large IBM System i server. The customer does not have a SAN installed. The customer will require approximately 4 TB for System p and 3 TB for System i. The customer states that performance and isolation of the System i system is most important. Capacity, multi-path access, and replication functions are important for the System p servers. Which solution best satisfies the customer requirements()
第6题:
A customer has an EMC Symmetrix DMX3000 that is at the end of lease. The environment consists of IBM System p, IBM System i, and IBM System z. The customer is evaluating EMC, HDS, and IBM storage as possible replacements. They are interested in comparing the performance of all three disk subsystems. Which tool compares performance()
第7题:
A customer called and indicated that their p690 system did not come with any installation and user manuals. Which of the following sources can best provide this information? ()
第8题:
The Business Partner technical specialist is called to check if the addition of host ports on an IBM System Storage DS8000 system has improved users’ response times for an IBM System p server running SAP. How can the improvement be verified()
第9题:
A customer wants to consolidate storage from four IBM System p servers and one large IBM System i server on a high end disk subsystem. The customer does not have a SAN installed. The customer will require approximately 24 TB of capacity for System p and 20 TB of capacity for System i. The customer states that performance of the System i system is most important. Capacity, multi-path access, and replication functions are important for the System p servers. Which solution best satisfies the customer requirements()
第10题:
A System p administrator is currently working on a problem with IBM Support. The administrator feels that their expectations are not being met on this problem. What is the IBM recommended procedure to ensure that the request is handled appropriately ()