IBM认证考试

The first step documented in Company.com’s HACMP test plan is to start the cluster manager on the normal service node and verify that HACMP daemons have started with the ’lssrc -g cluster" command.  What daemons MUST show as active in the ’lssrc -g clust

题目

The first step documented in Company.com’s HACMP test plan is to start the cluster manager on the normal service node and verify that HACMP daemons have started with the ’lssrc -g cluster" command.  What daemons MUST show as active in the ’lssrc -g cluster" command to have an operational cluster?()  

  • A、 clstrmgrES,clsmuxpdES
  • B、 topsvcsd,grpsvcsd,exaixos
  • C、 topsvcsd,grpsvcsd,clinfoES,grglsmd
  • D、 clstrmgrES,clsmuxpdES,topsvcsd,grpsvcsd
如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer is purchasing an IBM System Storage DS8700. What is the most important first step for the installation?()

A. verify configuration

B. conduct pre-install TDA

C. complete physical planning

D. verify the solution meets requirements


参考答案:B

第2题:

The first step in the continuous improvement is to ( ).




A. identify improvement strategies
B. collect data
C. identify of measurement target
D. process data

答案:A
解析:
持续改进的第一步是( )。A.识别改进策略 B.收集数据 C.识别测量目标 D.处理数据

第3题:

Try to find out the reasons of your stress is always the first step to overcome stress.()

此题为判断题(对,错)。


参考答案:对

第4题:

What is the FIRST step in diagnosing a completely dead computer that was working fine the day before?()

  • A、remove all peripherals and reinstall them one at a time
  • B、replace the CMOS battery
  • C、check the AC power cord and verify the power source
  • D、back up the entire hard drive

正确答案:C

第5题:

Which of the following is the FIRST step when troubleshooting an issue?()

  • A、Identify the problem.
  • B、Verify full system functionality.
  • C、Document all findings.
  • D、Establish a theory of probable cause.

正确答案:A

第6题:

If our cooperators achieve from the first step, they will look forward to____

A. having goods
B. making progress
C. being made progress
D. process

答案:B
解析:
本句意为“如果我们的合作伙伴从第一步开始就进展顺利的话,他们将期待____”look forward to 表示“期望,期盼”,to 是介词,后接名词或动名词。make progress“取得进展”,根据句意可知,应为主动形式,故选B。

第7题:

Which of the following is the FIRST step a technician should take when troubleshooting a device issue?()

  • A、Gather information from the customer.
  • B、Isolate the problem on the device.
  • C、Read the service documentation for possible causes.
  • D、Check the parts life counters.

正确答案:A

第8题:

● The first step in building a PERT/CPM network is to:

A Create a flow chart

B Determine the critical path

C Show task relationships

D Create a work breakdown structure

E None of the above.


正确答案:D

第9题:

What is the first step of the core baselining process? ()

  • A、Verify that the SNMP MIB is supported in the relevant core device.
  • B、Implement monitoring using SNMP or RMON.
  • C、Poll and record specific SNMP MIB objects from the device.
  • D、Implement threshold monitoring using RMON.

正确答案:D

第10题:

A user reports that their touchpad no longer works on their laptop. Which of the following is the FIRST troubleshooting step?()

  • A、Plug in USB keyboard
  • B、Check for a disable switch
  • C、Contact the laptop manufacturer
  • D、Plug in a USB mouse

正确答案:B

更多相关问题