IBM认证考试

A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increas

题目

A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers. What configuration setting does the storage specialist need to highlight?()

  • A、increase the buffer credits on the HBAs
  • B、increase the number of device logins on the ESX servers
  • C、additional paths will be required between the servers and storage
  • D、multipath option on the ESX servers should be changed to round-robin
如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

123 Which of the following constitute Juran's "quality trilogy":

A. planning, inspection, control.

B. planning, improvement, control.

C. planning, organization, control.

D. product, price, customer.

E. design, build, deliver.


正确答案:B

第2题:

A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()

A.0

B.1

C.2

D.4


参考答案:A

第3题:

Including the customer in the process of project planning is:

A.Slow and counterproductive.

B.Essential in the definition and documentation of project goals.

C.Necessary, but of limited value.

D.Unnecessary because project goals are defined in the proposal stage.

E.None of the above.


正确答案:B
B

第4题:

A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()

  • A、0
  • B、1
  • C、2
  • D、4

正确答案:A

第5题:

Choose the most accurate statement regarding the account qualification and planning service component in the prepare phase.()

  • A、 providing a partner with information regarding customer acceptance of a new solution
  • B、 providing information regarding current network infrastructure readiness
  • C、 using stakeholder interviews to identify stakeholders and decision-makers high-level solutionrequirements timelines and the scope of an opportunity
  • D、 adjusting a solution to account for a customer’s physical site characteristics

正确答案:C

第6题:

● Including the customer in the process of project planning is:

A Slow and counterproductive.

B Essential in the definition and documentation of project goals.

C Necessary, but of limited value.

D Unnecessary because project goals are defined in the proposal stage.

E None of the above.


正确答案:B

第7题:

Where should known problem areas in the site survey be documented?()

  • A、nowhere (but should be discussed with the customer)
  • B、on the site survey map and within the site survey text
  • C、on the customers blueprints
  • D、in the Cisco WCS Planning Tool

正确答案:B

第8题:

Which of the following constitute Juran's "quality trilogy":

A . planning, inspection, control.

B . planning, improvement, control.

C . planning, organization, control.

D . product, price, customer.

E . design, build, deliver.


正确答案:B

第9题:

A customer has ordered a rack, a p650, two p630s, and two p615s.  During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit.  However, the specialist knows that the p650 will be racked, but the other systems will arrive separately.  In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()

  • A、Because additional systems would require more power receptacles
  • B、Because the customer may need to do additional facilities planning
  • C、Because the customer needs additional funding to cover the services
  • D、Because postponing the eventual discussion will likely lead to customer dissatisfaction

正确答案:D

第10题:

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()

  • A、operator training
  • B、cache size of the two clusters
  • C、fibre bandwidth capability between the sites
  • D、number of stacked tape drives attached to each cluster

正确答案:C