A customer needs to install a rack with six of the x3650 M3 servers with the standard line cords. Each server has redundant power supplies. Which of the following meets this requirement?()
第1题:
An installed manufacturing customer has a mission-critical application that requires a rack mount server that will protect them against downtime in the event memory DIMM failure occurs. They also need load balancing, fault tolerant NICS and redundant power supplies and fans. Which of the following servers meets these requirements.()
第2题:
A customer is planning to implement a new x445 in their datacenter.Which TWO of the following should the customer prepare prior to the implementation to ensure a trouble free installation?()
第3题:
Your customer wants to build a network for a financial trading floor that has a requirement for multiple high-value transactions, which are also vital to the customer. What are the two most critical requirements? ()(Choose two.)
A. no single point of failure
B. trading database server location
C. redundant application servers location
D. deterministic response to all failures
E. determine which protocol to use
第4题:
Which of the following is the BEST case scenario for power fault tolerance within a server?()
第5题:
Your customer has converted from traditional servers to BladeCenter technology and has a requirement for an RSA adapter on a new BladeCenter server. Which of the following options would you use? ()
第6题:
A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated. The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage. Each system has the following: ? 2 integrated network ports ? 2 fibre channel adapter cards ? 1 power supply and redundant cooling ? HACMP v5.1 In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()
第7题:
A small IT department is deploying Power 720 servers exploiting virtualization technologies. Each Power 720 will have two partitions, one with 6 cores and one with 2 cores, and both partitions having 32GB of memory each. Live Partition Mobility is being considered at some point in the future. What is the minimum AIX Edition required to support the customer?()
第8题:
Your customer wants to build a network for a financial trading floor that has a requirement formultiple high-value transactions, which are also vital to the customer. What are the two mostcritical requirements?() (Choose two.)
第9题:
An administrator has a single 14U rack. The administrator needs to install fifteen servers; rack-mounted redundant uninterruptible power supplies (UPSs), a network switch, and a KVM. Which of the following server types would be BEST suited for this scenario?()
第10题:
A technician is responsible for overseeing twelve remote offices. There was a report of a power outage at one of the remote offices the night before, and now one of the servers there has not rebootedeven though it was shut down gracefully. The technician was forced to travel two hours just to turn theserver on. Which of the following is the MOST cost effective way to prevent future travel?()