物流员(四级)

英译中:Order cycle time

题目

英译中:Order cycle time

参考答案和解析
正确答案: 订货处理周期
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

161 Time management is the allocation of time in a project's life cycle through the process of: A. Planning

B. Estimating.

C. Scheduling.

D. Controlling

E. All of the above


正确答案:E

第2题:

I hope you’ll try to persuade the manufacturer to speed up production and give our order a special consideration.(英译中)


参考答案:我希望贵方能给我方的订单以特殊考虑,尽量说服生产厂家加速生产。

第3题:

Time management is the allocation of time in a project's life cycle through the process of:

A.Planning

B.Estimating.

C.Scheduling.

D.Controlling

E.All of the above.


正确答案:E
E

第4题:

Cycle Time也就是C/T的意思是?


正确答案: 每出一个成品所间隔的时间。

第5题:

We place the first order on the clear understanding that the goods are dispatched in time to reach here by August 30, and reserve the right to cancel it after this date.(英译中)


参考答案:我们明确该首批订货将在8月30日前及时运抵此地。如果交货迟于此日期,我们保留取消定单的权利。

第6题:

As you fail to deliver the goods in time, it has caused great inconvenience to us.(英译中)


参考答案:由于你方未按时发货,给我们带来许多不便。

第7题:

We have booked your order for 12,000 metric tons of Canada Oat as per your fax of September 18 and our E-mail of September 20, and wish to assure you that, upon receipt of the relevant L/C, we shall effect shipment in time.(英译中)


参考答案:我们已按照你方9月18日的传真和我方9月20日的E-MAIL,接受了你方12000吨加拿大燕麦的定单,并且向你方保证,一旦收到有关的信用证,我们将及时装运。

第8题:

79 Time management is the allocation of time in a project's life cycle through the process of:

A. Planning

B. Estimating.

C. Scheduling.

D. Controlling

E. All of the above.


正确答案:E

第9题:

Enclosed please find our Order No.ST 112.If the quality is up to our expectation, we are prepared to place a large order with you next year. Your close attention to this order will be highly appreciated.(英译中)


参考答案:附上我方第ST112号定单,请查收。如果质量达到我方要求,我们明年大量订购。你们如能密切关注这份定单,我们将不胜感激。

第10题:

英译中:Inventory cycle time


正确答案: 库存周期