Oracle认证考试

Which three tasks can be performed using a duplicate database?()A、 Testing the backup and recovery proceduresB、 Testing the upgrade of an Oracle database to a new releaseC、 Testing the effect of an application changes on database performanceD、 Continuousl

题目

Which three tasks can be performed using a duplicate database?()

  • A、 Testing the backup and recovery procedures
  • B、 Testing the upgrade of an Oracle database to a new release
  • C、 Testing the effect of an application changes on database performance
  • D、 Continuously updating archive log files from the target database to support failover
如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Which three tasks can be performed using a duplicate database?()

A. Testing the backup and recovery procedures

B. Testing the upgrade of an Oracle database to a new release

C. Testing the effect of an application changes on database performance

D. Continuously updating archive log files from the target database to support failover


参考答案:A, B, C

第2题:

Which three components does the Scheduler use for managing tasks within the Oracle environment? ()(Choose three.)

A. a job

B. a program

C. a schedule

D. a PL/SQL procedure


参考答案:A, B, C

第3题:

Scheduling is the process by which decisions are made concerning:

A.Tasks to be accomplished.

B.Personnel/organization that will be assigned to accomplish the task.

C.Time when the tasks are to be completed.

D.All of the above.

E.A and C only.


正确答案:E
E

第4题:

If you click the Configure button along the top of Cisco SDM is graphical interface,which Tasks buttonpermits you to configure such features as SSH, NTP, SNMP, and syslog?()

  • A、Interfaces and Connections
  • B、Intrusion Prevention
  • C、Security Audit
  • D、Additional Tasks

正确答案:D

第5题:

Which three tasks can be performed using a duplicate database? ()(Choose three.)

A. Testing the backup and recovery procedures

B. Testing the upgrade of an Oracle database to a new release

C. Testing the effect of an application changes on database performance

D. Continuously updating archive log files from the target database to support failover


参考答案:A, B, C

第6题:

Which three components does the Scheduler use for managing tasks within the Oracle environment?()

A. a job

B. a program

C. a schedule

D. a PL/SQL procedure


参考答案:A, B, C

第7题:

Which three tasks can be performed by using the performance Schema?()

A.Finding queries that are not using indexes

B.Finding rows that are locked by InnoDB

C.Finding client connection attributes

D.Finding the part of a code in which a single query is spending time

E.Finding the size of each table


参考答案:A, B, C

第8题:

● The critical path is calculated by

A subtracting the end date of task one from the start date of task two.

B determining which tasks have the least amount of total slack.

C totaling the time for all activities.

D determining the shortest path through the network.

E Determining which tasks have the most slack


正确答案:B

第9题:

NBAR is a Cisco IOS feature that can be used to perform three tasks?


正确答案: (1)Protocol discovery
(2)Traffic statistics collection
(3)Traffic classification

第10题:

Which three components does the Scheduler use for managing tasks within the Oracle environment? ()(Choose three.)

  • A、a job
  • B、a program
  • C、a schedule
  • D、a PL/SQL procedure

正确答案:A,B,C

更多相关问题