CMS专题

单选题Companycom wants to apply a PTF to the p5 590 system. After doing a preview install, the output shows there is insufficient space in the /usr filesystem. The root volume group has no available physical partitions left. They do not want to add additiona

题目
单选题
Companycom wants to apply a PTF to the p5 590 system. After doing a preview install, the output shows there is insufficient space in the /usr filesystem. The root volume group has no available physical partitions left. They do not want to add additional disk drives to the system, but have a jfs2 filesystem that is only 8% used. What could they do to utilize space in the jfs2 filesystem to apply this PTF?()
A

Backup the filesystem and recreate smaller

B

Use the chfs to reduce the filesystem size

C

Use cplv to copy filesystem to smaller size

D

Use migratepv to copy filesystem to smaller size

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Companycom wants to apply a PTF to the p5 590 system. After doing a preview install, the output shows there is insufficient space in the /usr filesystem. The root volume group has no available physical partitions left. They do not want to add additional disk drives to the system, but have a jfs2 filesystem that is only 8% used. What could they do to utilize space in the jfs2 filesystem to apply this PTF?()

  • A、Backup the filesystem and recreate smaller
  • B、Use the chfs to reduce the filesystem size
  • C、Use cplv to copy filesystem to smaller size
  • D、Use migratepv to copy filesystem to smaller size

正确答案:B

第2题:

Companycom is considering a partitioned solution which will require cumulative rPerf total of 150. The original sizing came back recommending a 32-way p5 590. However, they have a requirement for future scalability and availability is important. Which of the following would be the best reason to recommend a p5 595?()

  • A、The p5 595 would allow for COD
  • B、The p5 595 includes the Advanced Power Virtualization hardware and software
  • C、The p5 595 is priced the same as the p5 590 given the same number/type of CPUs
  • D、The p5 595 performance would be equivalent to the p5 590 given the same number/type of CPUs

正确答案:A

第3题:

For the p5 590 and p5 595 servers, the HMC must be directly attached. Why is the use of a private service network between HMC and the p5 590 required?()

  • A、The Bulk Power Controllers are dependent upon the HMC to provide them with DHCP  addresses.
  • B、A firewall is required to isolate the private network from any of the open networks to which the HMC is attached.
  • C、Network communications can be implemented through an open network. No private network  is required but it is recommended.
  • D、All p5 590 and 595 servers are shipped with one service processor card. A private network is  required to manage DHCP addresses.

正确答案:A

第4题:

A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()

  • A、A CD or DVD with installation media
  • B、An internal SCSI adapter in the target LPAR
  • C、An Ethernet adapter for access to an FTP server
  • D、Advanced Power Virtualization feature of the p5 590

正确答案:A

第5题:

A system administrator is installing a p5 590 server with an HMC. After pulling the websm client down, it is not possible to connect to the HMC. The HMC can be pinged from the client. Which of the following settings should be verified next?()

  • A、The routes on the HMC
  • B、The firewall setting of the LAN adapter
  • C、The name resolution protocol on the p5 590 server
  • D、The subnet mask settings on the Ethernet adapters

正确答案:B

第6题:

Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()

  • A、An administrative VLAN with port 1808
  • B、Port 657 which must remain open to TCP/IP and UDP traffic
  • C、Network addresses are provided by DHCP services on the network
  • D、DHCP on the HMC is required to be on to communicate between LPAR and HMC

正确答案:B

第7题:

Companycom has just added some new disk drives to a p5 590. The customer needs to know the largest Logical Track Group that these drives will support. What is the best way to locate this information?()

  • A、Use lquerypv to read the drive
  • B、Use lspv and look at PP Size value
  • C、Look on the outside of the drive itself
  • D、Use bootinfo to find the LTG on the drive

正确答案:A

第8题:

Companycom has a system running AIX 5.2 and wants to upgrade to AIX 5.3. What method would provide the quickest recovery if the upgrade failed?()

  • A、Use alt_disk_install
  • B、Backup image to NIM server
  • C、Backup using mksysb to DVD-RAM
  • D、Apply the upgrade and do not commit

正确答案:A

第9题:

Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()

  • A、Upgrade the p690 to a p5 590 server running AIX 5.3
  • B、Upgrade the p690 server to AIX 5.3 and implement Advanced Power Virtualization
  • C、Purchase a p5 590 with minimum resources and simply reuse the p690 unused fiber HBA adapters
  • D、Purchase a p5 590 that has all the needed resources and adapters for Advanced Power Virtualization

正确答案:D

第10题:

Companycom is purchasing a 64-way p5 595. They have determined the location for the server is in a datacenter which does not have a raised floor. Which of the following would best meet the server requirements?()

  • A、The server must be installed into a location with a raised floor for optimum system cooling  and cable management.
  • B、The server should be purchased as a p5 590 and then upgraded to a p5 595. This will eliminate the need for a raised floor environment.
  • C、The server should be purchased as 32-way p5 595 and then upgraded to a 64-way. This will eliminate the need for a raised floor environment.
  • D、The server can be installed into a location without a raised floor if an RPQ is obtained. It is a strong IBM recommendation for a raised floor, not a requirement.

正确答案:A

更多相关问题