The DIMM is taken off line, and fault tolerance is available on the other DIMMs only.
The memory bank is taken offline and rebuilt with the online hot spare and then brought back on line.
The memory bank containing the failed DIMM is taken off line, and the system is no longer fault tolerant until replaced.
The DIMM is taken offline, and the online hot spare is initiated and the system remains fault tolerant.
第1题:
第2题:
An installed manufacturing customer has a mission-critical application that requires a rack mount server that will protect them against downtime in the event memory DIMM failure occurs. They also need load balancing, fault tolerant NICS and redundant power supplies and fans. Which of the following servers meets these requirements.()
第3题:
A. Hot site
B. Active/passive clustering at the same site
C. Disk-to-disk replication in the same server
D. Warm site
第4题:
A server has six drives of equal size attached to a RAID controller. Which of the following fault tolerant RAID levels would allow the maximum amount of data to be stored? ()
第5题:
What are two benefits for prospects, derived from the Cisco SBR Methodology?()
第6题:
PLC IO Rack Fault翻译为: PLC I/O支架故障。
第7题:
While explaining to a customer the fault tolerant benefits of x445 they ask what happens if they implement memory mirroring and a DIMM fails in the SMP expansion module. Which of the following is the most appropriate response?()
第8题:
A. RAID 1 +0
B. RAID 5
C. RAID 0
D. RAID 1
第9题:
Which two options are benefits of the Cisco Technical Assistance Center?()
第10题:
Which of the following replication methods is MOST fault tolerant?()