DISL
ISL
DTP
IEEE 802.1Q
MPLS
None of the other alternatives apply
第1题:
CIS .com recently acquired a smaller competitor. The acquired company is not currently using Cisco routers, so you have connected the two WANs via an authenticated PPP link. After configuration both routers, issuing the show interface s0/0 command on the Cisco Router shows the interface to be in the up/down state.Which two of these are possible causes? ()
A. Bandwidth statements do not match
B. MTUs do not match
C. IP Addresses are not in the same subnet
D. CHAP passwords do not match
第2题:
A. to a core switch running Cisco NSF and SSO from redundant distribution switches connected with a Layer 2 link
B. to a core switch running Cisco NSF and SSO from redundant distribution switches connected with a Layer 3 link
C. to two core switches from redundant distribution switches connected with a Layer 2 link
D. to two core switches from redundant distribution switches connected with a Layer 3 link
E. to two core switches running Cisco NSF and SSO from two redundant distribution switches running Cisco NSF and SSO
第3题:
There are 2 switches in the Ezonexam LAN, with no routers. Ports 1, 2 & 3 are assigned to VLAN 1 in switch 1 and 2 and ports 4, 5 & 6 are assigned to VLAN 2 in both switches. These two switches are connected together via a trunked link. Which of the conditions below would verify trunk and VLAN operation? (Select all valid answers)
A.Host 1 on VLAN 1 can ping Host 2 on VLAN 1
B.Host 1 on VLAN 1 can ping Host 4 on VLAN 2
C.Host 1 on VLAN 1 can not ping Host 2 on VLAN 1
D.Host 4 on VLAN 2 can not ping Host 1 on VLAN 1
E.Host 4 on VLAN 2 can ping Host 2 on VLAN 2
第4题:
In which of the following scenarios would the "show cdp neighbors detail"command be an appropriate troubleshooting tool?()
第5题:
You need to investigate a VTP problem between two Company switches. The lack of which two prevents VTP information from propagating between switches?()
第6题:
A. Set each end of the trunk line to IEEE 802.1Q encapsulation.
B. Set the same VTP management domain name on both switches.
C. Set all ports on the two switched as access ports.
D. Configure one of the two switches as a VTP server.
E. Connect the two switches using a rollover cable.
F. Use a router to forward VTP traffic between the VLANs.
第7题:
A.show interfaces interface
B.show vlan bri
C.show interfaces interface switchport
D.show interface interface trunk
E.show interfaces vlan
第8题:
What must the Ezonexam network administrator do in order to successfully configure a VLAN trunk between two switches named VE1 and VE2? (Select two answer choices)
A. Set each end of the trunk line to IEEE 802.1Q encapsulation.
B. Set the same VTP management domain name on both switches.
C. Set all ports on the two switched as access ports.
D. Configure one of the two switches as a VTP server.
E. Connect the two switches using a rollover cable.
F. Use a router to forward VTP traffic between the VLANs.
第9题:
To which switch or switches should you provide redundant links in order to achieve high availability with reliable fast convergence in the enterprise campus?()
第10题:
Two Company switches are connected via a trunk link. In this network, the original frame is encapsulated and an additional header is added before the frame is carried over a trunk link. At the receiving end, the header is removed and the frame is forwarded to the assigned VLAN. This describes which technology?()