单选题A customer requires an infrastructure to support disaster recovery of critical applications between two remote data centers. One data center is in Tokyo and one is in Beijing. The customer’s Recovery Point Objective (RPO) requires a six-hour window for

题目
单选题
A customer requires an infrastructure to support disaster recovery of critical applications between two remote data centers. One data center is in Tokyo and one is in Beijing. The customer’s Recovery Point Objective (RPO) requires a six-hour window for a bandwidth of 100 MB/s and a new storage system for a total of 4 TB of data. They estimate 100 MB of new data produced hourly. What data synchronization method would be recommended to meet the requirements()
A

Metro Mirror

B

FlashCopy

C

Global Mirror

D

Snapshot

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

What is one reason you might recommend a solution using only autonomous access points to a customer? ()

  • A、 The customer requires Layer 3 roaming.
  • B、 The customer requires immediate wire line integration with a catalyst 6500 switch.
  • C、 The customer needs an outdoor-ready access point.
  • D、 The customer wants the option to migrate to LWAPP.

正确答案:D

第2题:

The customer has recently installed a pSeries p5-570 with EMC attached disk storage.  After installation, the customer complained that the disk access appeared to be too slow.  How should the pSeries technical specialist best assist the customer?()

  • A、Recommend the customer call EMC.
  • B、Recommend the customer call IBM hardware support.
  • C、Recommend the customer contact SupportLine.
  • D、Recommend the customer re-creates the volume groups.

正确答案:C

第3题:

Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()

A.Hotsite

B.Coldsite

C.Warmsite

D.Failoversite


参考答案:B

第4题:

In which of these phases is a customer’s current network infrastructure assessed?()

  • A、 Plan
  • B、 design
  • C、 implement
  • D、 prepare

正确答案:A

第5题:

What is SCM?()

  • A、Supply Customer Management        
  • B、Support Customer Management
  • C、Supply Chain Materials              
  • D、Supply Chain Management

正确答案:D

第6题:

In the plan phase, network readiness assessment addresses which customer need? Select exactly 1 answer(s) from the following:()。

  • A、an assessment of the preparedness of the customers existing system infrastructure to support a propose solution
  • B、a comprehensive design that has been customized based on the operations processes, network management processes, and tools of its system
  • C、an in-depth assessment of the operational environment required to support the operation of both the current and planned solutions
  • D、the optimal technologies for supporting its business requirements and objectives

正确答案:A

第7题:

The customer asks for a scalable SQL server solution. What advantages supports the choice of the System x3950?()

  • A、More processing ’head room’ for a SQL infrastructure using eXpand on Demand
  • B、A more affordable platform choice than HP Itanium based server
  • C、IBM Services to install and support the solution
  • D、All of the above

正确答案:D

第8题:

A customer wants to deploy a centralized storage system to support a new database. Which of the following factors should the storage specialist consider first?()

A. disaster recovery strategy

B. the number of IOPS required

C. the capacity of each hard drive

D. how the database will be backed up


参考答案:B

第9题:

If XYZ LTD needs to sign a contract that includes infrastructure design, deployment,support services and applications, what would be the best option?()

  • A、Cisco SMB Support Assistant
  • B、Cisco Technical Support Services
  • C、Cisco Advanced Services
  • D、Cisco SMARTnet

正确答案:C

第10题:

Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()

  • A、Hotsite
  • B、Coldsite
  • C、Warmsite
  • D、Failoversite