Operate
Design
Deploy
Implement
第1题:
Which of the following statements is correct?
A.The definition phase results in the Software Requirements Specification.
B.Testing is optional in software life cycle.
C.CASE tools can only aid in the design phase of a software life cycle.
D.A change during a later phase does not require the documentation of all earlier phases to be updated.
第2题:
At sea,all required GMDSS equipment(other than survival craft equipment)must be proven operational by ______.
A.daily testing
B.either A or C
C.operational use of the equipment
D.testing at least every 48 hours
第3题:
Which phase of the software development requires the most development time?
A.the design phase
B.the testing phase
C.the maintenance phase
D.the development phase
第4题:
During the implement phase, systems acceptance testing does which of the following for the customer? Select exactly 1 answer(s) from the following:()。
第5题:
第6题:
●In general,atypical (71) model is composed of several phases, such as requirements analysis phase, generaUdetailed design phase, implementation phase, system acceptance testing phase.
(71)
A. waterfall
B.incremental
C.spiral
D.prototyping
第7题:
第8题:
Black-box and white-box testing method ale often used in software testing phase, in which, the white-box is mainly used to test software's(73).
A.external function of a program
B.reasonableness of structure
C.internal logic of a program
D.correctness of a program
第9题:
第10题:
Which of these is a benefit of ESM?()