单选题A customer is running a number of non-IBM servers purchased two years ago and has settled on one of the new IBM xSeries servers as a migration path.  From the following options, which is the preferred migration path?()A Copy the image of the non-IBM se

题目
单选题
A customer is running a number of non-IBM servers purchased two years ago and has settled on one of the new IBM xSeries servers as a migration path.  From the following options, which is the preferred migration path?()
A

Copy the image of the non-IBM servers and copy that image to the IBM servers, then reboot the IBM servers.

B

Copy the image from the non-IBM servers with RDM and install them with IBM Director to the new IBM servers. Reboot the IBM servers.

C

Install a fresh operating system using ServerGuide, and then install the applications and copy the data from the old servers.

D

Install a fresh operating system on the IBM servers and then run ServerGuide on the IBM servers to migrate the applications and data to the IBM servers.

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

While discussing the customer’s environment the storage specialist discovers that the customerhas both Windows and UNIX servers running various applications. The customer is looking for acost effective 10 TB solution that includes a mirrored site to meet their Disaster Recovery plan.Which of the following solutions should be recommended?()

  • A、DS5020 system running Metro Mirror and Volume Copy
  • B、Storwize V7000 running FlashCopy and Volume Copy
  • C、DS5020 system runningFlashCopy and Enhanced Remote Mirror
  • D、DS5300 system runningFlashCopy and Enhanced Remote Mirror

正确答案:C

第2题:

retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere.Which of the following should be discussed with this customer? ()

  • A、Is the web content static or dynamic information 
  • B、Consider two servers for redundancy and failover 
  • C、What is the average CPU utilization of the existing web servers 
  • D、Will the servers need a SCSI or Fibre Channel storage solution

正确答案:B

第3题:

A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers.What configuration setting does the storage specialist need to highlight?()

A. increase the buffer credits on the HBAs

B. increase the number of device logins on the ESX servers

C. additional paths will be required between the servers and storage

D. multipath option on the ESX servers should be changed to round-robin


参考答案:D

第4题:

A customer has a mixed Dell and IBM server environment.  They want to implement a system management solution for all their Windows, Linux, and VMWare ESX Intel based servers.  Which TWO features of IBM Director will be an advantage for this customer?()

  • A、IBM Director comes with free Aurema and SteelEye software plug-ins.
  • B、IBM Director supports non-IBM industry standard Intel based servers.
  • C、IBM Director servers can be managed from within the MS Performance Monitor.
  • D、IBM Director requires no agents to be installed and run on the IBM systems.
  • E、IBM Director offers agents to manage VMWare ESX Server and runs on Linux while Dell does not.

正确答案:B,E

第5题:

A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers. What configuration setting does the storage specialist need to highlight?()

  • A、increase the buffer credits on the HBAs
  • B、increase the number of device logins on the ESX servers
  • C、additional paths will be required between the servers and storage
  • D、multipath option on the ESX servers should be changed to round-robin

正确答案:D

第6题:

A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700. How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()

  • A、8 drive sets of 300 GB drives
  • B、4 drive sets of 300 GB drives
  • C、14 drive sets of 146 GB drives
  • D、18 drive sets of 146 GB drives

正确答案:D

第7题:

A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()

  • A、Ensure Director Agent is installed on the new servers.
  • B、Ensure a DHCP Sever is installed and configured in the environment.
  • C、Ensure Server Plus Pack option has been installed and configured.
  • D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.
  • E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.

正确答案:B,E

第8题:

A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700.How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()

A. 8 drive sets of 300 GB drives

B. 4 drive sets of 300 GB drives

C. 14 drive sets of 146 GB drives

D. 18 drive sets of 146 GB drives


参考答案:D

第9题:

A Dell customer decided to use IBM Director and xSeries to manage their servers.  They purchased 10 IBM x336 servers and they already have 75 various Dell servers.  Which TWO steps need to be verified to be able to manage the mixed environment with IBM Director?()

  • A、Verify that the Dell systems have TCP/IP enabled
  • B、Verify that the systems are running the IBM Director Agent
  • C、Verify that the managed systems are SMBIOS 2.1 and WfM 2.0 compliant
  • D、Verify that the Dell systems have at least a 1GB of memory installed
  • E、Install an SNMP agent on the Dell systems as IBM Director cannot manage Industry Standard non-IBM servers

正确答案:B,C

第10题:

A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()

  • A、z/OS, DS8000, TSM
  • B、TSM, LTO-5, VMware
  • C、System x, VMware, XIV
  • D、System p, VMware, DS5000

正确答案:C