Add the software to /usr/sys/inst.images
Update the bundle file in /usr/sys/inst.images
Install the bundle filelists and run update all
Add the software to the bundle file in /usr/sys/inst.data/sys_bundles
第1题:
A base operating system has just been installed, successfully rebooted, and the user is now logged in as root. The user wants the server software bundle installed, but has additional software that must be installed with the bundle. Which of the following procedures should be performed to complete the installation?()
A.Add the software to /usr/sys/inst.images
B.Update the bundle file in /usr/sys/inst.images
C.Install the bundle filelists and run update all
D.Add the software to the bundle file in /usr/sys/inst.data/sys_bundles
第2题:
An administrator has just installed a new NIC into the server. The system POSTs fine and the NIC is recognized by the OS, but it does not receive an IP address. Which of the following is the MOST likely cause of this?()
第3题:
An administrator has just installed a new NIC into the server. The system POSTs fine and the NIC is recognized by the OS, but it does not receive an IP address. Which of the following is the MOST likely cause of this?()
A. The NIC is not on the HCL.
B. The driver is incorrect on the server.
C. The patch cable has not been seated properly.
D. The NIC is not seated properly.
第4题:
A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()
第5题:
The administrator has just installed a new memory module into the server. Now, the server is not showing the new memory. Which of the following should the administrator perform FIRST?()
第6题:
Automatic Updates should be performed to ensure that the computer has the latest:()
第7题:
An administrator is planning an upgrade of a major software package on an application server.The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()
第8题:
A.User ID/password file
B.Communications layer
C.Client applications
D.Operating system
第9题:
A patch has been applied to the operating system. After rebooting, the system is hung. Which of the following commands should have been performed to prevent the system from hanging?()
第10题:
A system administrator has just installed a new maintenance level, but "oslevel -r" does not show the correct maintenance level. What command can be used to determine which filesets are downlevel?()