Increase the number of NFS daemons for increased performance.
Modify the nfsrg1 resource group to use local NFS cross-mounts.
Create a second resource group to manage half the NFS cross-mounts.
Create post events to handle the cross-mounts after fallover processing.
第1题:
Which of the following is required to ensure the completion of all tests within the automated procedure of thecluster test tool?()
第2题:
During cluster fallover testing,the administrator determines that additional work is required to stop existing test applications on the standby node,prior to starting the production applications on the surviving node. To manage this type of requirement,which step should be performed first?()
第3题:
An administrator is reviewing the /tmp/hacmp.out after an unsuccessful fallover and notice that the event stop_server PROD_DB failed. Besides manually intervening,what step must be performed to return the cluster to a stable state?()
第4题:
Following a successful cluster fallover, clstat returns no status, the snmpinfo command hangs. All Cluster resources appear to be active. What should be done to resolve this problem?()
第5题:
A step in the HACMP test plan is to gracefully stop the cluster on a node and to verify that the Shared resources fallover to the standby node. To prepare for this testing step, both nodes in the two-node cluster are in a stable state with the single resource group active on Node ’A’. Which of the following is the best way to execute this portion of the test plan?()
第6题:
An administrator runs clstat on a cluster node and receives the following response: ’Can not get Cluster Information.’ Which of the following daemons may need to be started in order to correct this problem?()
第7题:
A two-node cluster has both a single TCP/IP heartbeat and a single non-IP serial heartbeat. TheService Level Agreement regarding the speed of cluster fallover has been updated,and Fast Disk Takeover will be implemented to meet the new Service Level Agreement. Which of the following should be implemented to increase the reliability of Fast Disk Takeover?()
第8题:
Company.com recently updated the programs used in an HACMP pre-event. The procedure Involved coping the new code over the old code in the appropriate directory on one of the nodes as indicated by the HACMP event entry. The cluster was synchronized. During a fallover test, the backup system did not behave as expected. What is the most likely problem?()
第9题:
An enterprise has three nodes: -Node ’A’ is a production database, -Node ’B’ is a production Application server, and -Node ’C’ is a test and development node. Node ’C’ is used by six programmers to develop and the production application as business critical and would like to make it highly available with HACMP. Application development and testing is not business critical. Which of the following describes the best solution?()
第10题:
As part of fallover testing of a corporate database server, client application connectivity must be verified. Which of the following would best verify the application functionality?()