Install the two cards in slots 5 and 6 in the x445.
Install the two cards in slots 3 and 5 in the x445 make sure slots 4 and 6 are not occupied.
Install an RXE-100 on each x445 and install one card in the x445 and one card in an RXE-100 on each system.
Connect an RXE-100 between the two x445s and install one card in each x445 and one card in each side of the RXE-100.
第1题:
A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()
A. operator training
B. cache size of the two clusters
C. fibre bandwidth capability between the sites
D. number of stacked tape drives attached to each cluster
第2题:
A company wants to consolidate 20 existing dual processor Pentium III servers, all running a web server application on Windows Server 2003. They are considering consolidating to a single x445 running VMWare ESX. Which TWO of the following questions will provide enough information to determine the correct processor configuration?()
第3题:
A. Connection set
B. Configuration set
C. Custom installer
D. Component set
第4题:
A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers. What configuration setting does the storage specialist need to highlight?()
第5题:
A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()
第6题:
Your customer wants to build a network for a financial trading floor that has a requirement for multiple high-value transactions, which are also vital to the customer. What are the two most critical requirements? ()(Choose two.)
A. no single point of failure
B. trading database server location
C. redundant application servers location
D. deterministic response to all failures
E. determine which protocol to use
第7题:
A customer is planning to implement a new x445 in their datacenter.Which TWO of the following should the customer prepare prior to the implementation to ensure a trouble free installation?()
第8题:
A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers.What configuration setting does the storage specialist need to highlight?()
A. increase the buffer credits on the HBAs
B. increase the number of device logins on the ESX servers
C. additional paths will be required between the servers and storage
D. multipath option on the ESX servers should be changed to round-robin
第9题:
A database administrator wants to design a multi-partition database that can take advantage of both intra-partition parallelism and inter-partition parallelism. Which configuration will allow the use of these types of parallelism while using the least number of hardware components (servers, processors)? ()
第10题:
A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()