The clstat.cgi program will provide a solution.
The customer must install Tivoli with the HACMP plugin for monitoring the cluster.
The clinfo program included in the HACMP distribution will solve the monitoring issues.
Customize the cluster to send error notifications for every event to an email at the network control center.
第1题:
Refer to the exhibit. ROUTE.com has just implemented this EIGRP network. A network administrator came to you for advice while trying to implement load balancing across part of their EIGRP network. If the variance value is configured as 2 on all routers and all o ther metric and K values are configured to their default values, traffic from the Internet to the data center will be load balanced across how many paths? ()
A. 1
B. 2
C. 3
D. 4
E. 5
第2题:
Which two design recommendations are most appropriate when EIGRP is the data center corerouting protocol? ()
第3题:
A.had been collected
B.has collected
C.has been collected
第4题:
A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored?()
第5题:
An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center. Which of the following site types should be considered to meet these requirements? ()
第6题:
A. Summarize data center subnets.
B. Use passive interfaces to ensure appropriate adjacencies.
C. Tune the EIGRP timers to enable EIGRP to achieve quicker convergence.
D. Adjust the default bandwidth value to ensure proper bandwidth on all links.
E. Advertise a default summary route into the data center core from the aggregation layer.
第7题:
An administrator is planning an upgrade of a major software package on an application server.The software has been identified, the project approved and the upgrade purchased. Which of the following steps should the administrator take NEXT?()
第8题:
An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.Which of the following site types should be considered to meet these requirements?()
A. Hot site
B. Warm site
C. Cold site
D. Active failover site
第9题:
An administrator has experienced minor electrical shocks when touching metal surfaces in the data center. Which of the following is the MOST likely cause?()
第10题:
An SNMP alert has been generated by a server in the main data center.The alert stated that the internal temperature of the server has exceeded the threshold.No other servers in the rack have experienced problems,and no other alerts have come from that server about any other events.Which of the following is the cause of this issue?()