海船船员考试

单选题In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().A chemical and physical properties of the materialB name of the alternative standard or specificationC the ASTM or ABS specification

题目
单选题
In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().
A

chemical and physical properties of the material

B

name of the alternative standard or specification

C

the ASTM or ABS specification the material approximates

D

manufacturer or origin of the material

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

______ is issued under the provision of International Convention for the Prevention of Pollution from Ships,1973,as modified by the Protocol of 1978 relating thereto.

A.INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATE

B.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATE

C.CARGO SHIP SAFETY EQUIPMENT CERTIFICATE

D.CARGO SHIP SAFETY RADIOTELEPHONY CERTIFICATE


正确答案:A

第2题:

A ship under construction or major repair will acquire permanent magnetism due to ______ while sitting stationary in the earth's magnetic field.

A.hammering and jarring

B.vibration and pounding

C.varying magnetic fields

D.stable or permanent magnetism of the ship


正确答案:A

第3题:

(c) State the specific inquiries you should make of Robson Construction Co’s management relevant to its

accounting for construction contracts. (6 marks)


正确答案:
(c) Specific inquiries – accounting for construction contracts
Tutorial note: This answer is illustrative of the types of inquiry that should be made. Other relevant answer points will be
awarded similar credit. For each full mark to be earned an inquiry should address the specifics of Robson (e.g. that its
accounting policies are ‘generally less prudent’). The identification of asset overstatement/liability understatement may
reduce the purchase price offered by Prescott.
■ Are any constructions being undertaken without signed contracts?
Tutorial note: Any expenditure on constructions without contracts (e.g. of a speculative nature, perhaps to keep the
workforce employed) must be accounted for under IAS ‘Inventories’; revenue cannot be recognised nor profit taken.
■ Is full provision made for future losses foreseen on loss-making contracts?
Tutorial note: The information in the brief is that ‘provisions are made’. The level of provision is not indicated and
could be less than full.
■ Which contracts started during the year are likely to be/have been identified as loss-making (for which no provision has
yet been made)?
Tutorial note: Profits and losses are only determined by contract at each financial year end.
■ What are management’s assumptions and judgments on the likely future outcome on the Sarwar contract (and other
actual and contingent liabilities)?
Tutorial note: Robson would be imprudent if it underestimates the probability of an unfavourable outcome (or
overestimates the likelihood of successful recourse).
■ What claims history has Robson experienced? (What proportion of contracts have been subject to claims? What
proportion of claims brought have been successful? How have they been settled? Under insurance? Out-of-court
settlement?) How effective are the penalty clauses? (Is Robson having to pay penalties for overrunning on contracts?)
■ What are the actual useful lives of assets used in construction? What level of losses are made on disposal?
Tutorial note: If such assets are depreciated over useful lives that are estimated to be too long, depreciation costs
incurred to date (and estimated depreciation to be included in costs to completion) will be understated. This will result
in too much profit/too little loss being calculated on contracts.
■ What is the cause of losses on contracts? For example, if due to theft of building supplies Robson’s management is not
exercising sufficient control over the company’s assets.

第4题:

An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()

  • A、The location and extent of application of different grades and strengths of materials.
  • B、The approved and available welding procedure adopted in the construction
  • C、Restrictions or prohibitions of repairing or modification
  • D、None of them

正确答案:A,B,C

第5题:

Which of the following materials is not appropriate for a teacher to use in listening practice?

A.Materials with different dialects.
B.Comprehensible authentic materials.
C.Materials with comprehensible new words for students.
D.Materials with contents beyond students’ comprehension capacity.

答案:D
解析:
考查听力教学法。
本题问的是不符合听力练习的。
D选项,材料超出学生的理解能力,符合题意,故此题的正确选项为D。
A选项,材料有不同的口音,英语国家比较多,所以学生训练听力的时候可以多听不同的方言,不合题意,故排除。
B选项和C选项,告诉我们在听力教学中,教师要选择符合学生听力水平的听力材料确定听力的难度适当,不合题意,故排除。
故此题的正确选项为D。

第6题:

In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the ______.

A.chemical and physical properties of the material

B.name of the alternative standard or specification

C.the ASTM or ABS specification the material approximates

D.manufacturer or origin of the material


正确答案:A

第7题:

When patching holes in the hull of a ship,pillows,bedding,and other soft materials can be used as ______.

A.caulking

B.gaskets

C.strongbacks

D.wedges


正确答案:B

第8题:

Of the following,______means the sufficiency of a vessel in materials,construction,equipment,crew,and outfit for the trade or service in which it is employed.

A.Proficiency

B.Seaworthiness

C.Cargoworthiness

D.Readiness


正确答案:B
下列情况中,适航性意指船舶在材料,结构,设备,船员和在从事生意或业务的装备方面的充分性。

第9题:

An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()

  • A、The location and extent of application of different grades and strengths of materials
  • B、The approved and available welding procedure adopted in the construction
  • C、Restrictions or prohibitions of repairing or modification
  • D、None of them

正确答案:A,B,C

第10题:

单选题
The construction portfolio may be included as part of the ship().
A

general plans

B

operating manual

C

builders documentation

D

CCS file


正确答案: C
解析: 暂无解析

更多相关问题