单选题In order to pay out or slack a mooring line which is under strain,you should().A sluice the lineB surge the lineC stopper the lineD slip the line

题目
单选题
In order to pay out or slack a mooring line which is under strain,you should().
A

sluice the line

B

surge the line

C

stopper the line

D

slip the line

参考答案和解析
正确答案: C
解析: 暂无解析
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

which order is an equivalent to “send out head line”?


正确答案:Pay out/Slack the head line.

第2题:

Mooring winch should be equipped with mechanical brakes which are capable of holding ______.

A.half the breaking strength of the mooring line

B.the full breaking strength of the mooring line

C.the maximum expected tension of the mooring line

D.50% over the working tension of the mooring line


正确答案:B

第3题:

什么票据是有效的?()

A.“Pay to M Co.or order the sum of one thousand US dollars.”

B.“Pay to M Co.providing the goods they supply are complied with contract the sum of one thousand US dollars.”

C.“Pay to M Co.out of the proceeds in our No.1 account the sum of one thousand US dollars.”

D.“Pay to M Co or order the sum of one thousand US dollars and charge/debit same to applicant’s account maintained with you.”


参考答案:AD

第4题:

根据下列汇票记载,可判定记载为()的汇票为无效汇票。

  • A、Pay to Jackson Co. or order the sum of six thousand US dollars. Drawn under L/C No.83419 issued by Westminster Bank Limited, London dated on 8th May 2004.
  • B、Pay to Jackson Co. or order the sum of six thousand US dollars and charge/debit same to applicant’s account with you.
  • C、Pay to Jackson Co. or order the sum of six thousand Hongkong dollars plus interest.
  • D、Pay to Jackson Co. or order the sum of six thousand Hongkong dollars plus interest calculated at the rate of 8% p.a.

正确答案:C

第5题:

Which statement is TRUE about the use of a“gob rope”________.

A.The gob rope is a mooring line for tying up lighters for working cargo alongside a vessel anchored in an open roadstead

B.The gob rope is used to secure the towline aft over the centerline of a tug

C.The gob rope is a line hung over a vessel's side to assist in boarding

D.The gob rope is a rope used in mooring a vessel to a buoy


正确答案:B

第6题:

which order is an equivalent to “let go stern line”?


正确答案:Undo/ slack off the stern line.

第7题:

A storm is forecast for the area where your vessel is moored. For its safety you should put ______.

A.more slack in the mooring lines

B.a strain on the mooring lines

C.chafing gear on the mooring lines

D.grease on the mooring lines


正确答案:C

第8题:

To “EASE” A LINE means to ___ .

A.cast off

B.double up so that one line does not take all the strain

C.pay out line to remove most of the tension

D.slack it off quickly


正确答案:C

第9题:

In order to pay out or slack a mooring line which is under strain, you should ______.

A.sluice the line

B.surge the line

C.stopper the line

D.slip the line


正确答案:B
为了松出或放松受力的系泊缆绳,你应放松缆绳。

第10题:

This mooring line is a little slack. Please ()it.

  • A、fast
  • B、fasten
  • C、slack away
  • D、slack

正确答案:B