clean anchor chain as it's hauled in
recover anchors which have lost their buoys
run and retrieve anchors
prepare anchor chain for inspection
第1题:
What is used to correct for both induced and permanent magnetism,and consequently must be readjusted with radical changes in latitude ________.
A.Flinders bar
B.Soft iron spheres
C.Fore-and-aft permanent magnets in their trays
D.Heeling magnet
第2题:
In a combination chain and wire rope mooring system, the anchor chain is deployed at the anchor end of the line to ______.
A.increase fatigue life of the system
B.reduce the time to retrieve the line
C.increase the holding power
D.reduce the catenary
第3题:
A chain stripper is used to ______.
A.prevent chain from clinging to the wildcat
B.clean the marine debris from the chain
C.flake chain from a boat's chain locker
D.clean chain prior to an x-ray inspection
第4题:
winch
windlass
draw works
dynamic pay out system
第5题:
Which of the following commands should be used to report statistics on network protocols used by the system?()
第6题:
Given the same water depth and line tension, the holding power of a 19 pound / foot wire rope mooring system in comparison to the holding power of a 90 pound / foot chain mooring system will be ______.
A.weaker
B.equal
C.greater
D.Indeterminable
第7题:
What is the difference between the CUoD and Utility Capacity On Demand?()
第8题:
What may NOT be used when securing heavy vehicles aboard Ro-Ro vessels ________.
A.Chain lever
B.Turnbuckle
C.Webbing
D.Chain
第9题:
Chain nervous system
第10题:
device for securing a chain topping lift
hook to prevent the anchor cable from slipping
device used to drag for a submerged cable or line
type of clam bucket used for discharging bulk cargo