海船船员考试

单选题Which of the following will increase the positive stability of your vessel?().A Loading weight on deckB Discharging weight from lower decksC Shifting weight from upper to lower decksD Shifting weight from lower to upper decks

题目
单选题
Which of the following will increase the positive stability of your vessel?().
A

Loading weight on deck

B

Discharging weight from lower decks

C

Shifting weight from upper to lower decks

D

Shifting weight from lower to upper decks

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Which of the following methods is used to increase the number of processes sharing the CPU?

A.Interrupt

B.Scheduler

C.Swapping

D.Working Set


正确答案:C

第2题:

Which of the following factors is the MOST likely cause of a power supply fan failure?()

A. Extreme temperature variances

B. Extreme humidity variances

C. Power stability fluctuations

D. Excessive dust accumulation


参考答案:D

第3题:

Which of the following does not contribute to increased Schedule Risk?

A labor shortage

B contractor claims

C lack of access

D sponsor scope changes

E all may increase schedule risk


正确答案:E

第4题:

Which of the following is true regarding the effect of EIGRP queries on the network design?()

  • A、 EIGRP queries will be the most significant issue with respect to stability and convergence 
  • B、 EIGRP queries are not a consideration as long as EIGRP has a feasible successor with a nexthop AD that is greater than the FD of the current successor route 
  • C、 EIGRP queries will only increase the convergence time when there are no EIGRP stubsdesigned in the network

正确答案:C

第5题:

Cross curves of stability show which of the following?

A.The righting arms at various angles of inclination and displacement

B.The metacentric height at large angles of heel

C.The height of the center of buoyancy at various angles

D.The metacentric radius at various displacements


正确答案:A

第6题:

When configured. MPLS can increase routing redundancy by providing which of the following network topology types?()

A.Bus

B.Mesh

C.Multipath

D.Ring


参考答案:B

第7题:

Which of the following constraint types can be used to ensure the value of an INTEGER column references only positive values?()

A.Unique

B.Check

C.Referential

D.Informational


参考答案:B

第8题:

Which of the following words best describes the author’s attitude towards China’s high-speed railway plan?

A.Critical.

B.Reserved.

C.Doubtful

D. Positive.


正确答案:D

第9题:

Freeboard is a measure of which of the following?Ⅰ.The amount of reserve buoyancy.Ⅱ.The initial stability of the vessel.

A.Ⅰ only

B.Ⅱ only

C.Both Ⅰ and Ⅱ

D.Neither Ⅰ nor Ⅱ


正确答案:A

第10题:

A customer is experiencing a performance bottleneck in a disk subsystem.  The server is performing sequential I/O with a small number of users requesting large files.  Which of the following would most likely resolve the bottleneck?()

  • A、Increase seek translation
  • B、Increase data transfer rate
  • C、Decrease rotational latency
  • D、Increase rotational latency

正确答案:B

更多相关问题