单选题The hull is divided up into a number of watertight compartments by().A inner bottom plating and longitudinalsB decks and bulkheadsC double bottom girdersD topside and hopper tank sloping plating and longitudinals

题目
单选题
The hull is divided up into a number of watertight compartments by().
A

inner bottom plating and longitudinals

B

decks and bulkheads

C

double bottom girders

D

topside and hopper tank sloping plating and longitudinals

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

---- I' m surprised to hear that Sue and Paul have __ .

----So am I. They seemed very happy together when I last saw them.

A. broken up B. finished up C. divided up closed up


正确答案:A

第2题:

To predict the actual depth of water using the Tide Tables,the number obtained from the Tide Tables is ______.

A.the actual depth

B.added to or subtracted from the charted depth

C.multiplied by the charted depth

D.divided by the charted depth


正确答案:B

第3题:

Risk event probability is defined as:

A the total number of possible events divided into the expectations or frequency of the risk event

B the number of times the risk event may occur

C the fraction of the total project tasks which may be affected by the risk event

D the total number of possible events divided into the consequences of the risk event.

E A and B


正确答案:A

第4题:

EIGRP has been configured to opera te over Frame Relay multipoint connections. What should the bandwidth command be set to?()

  • A、the CIR rate of the lowest speed connection multiplied by the number of circuits
  • B、the CIR rate of the lowest speed connection
  • C、the CIR rate of the highest s peed connection
  • D、the sum of all the CIRs divided by the number of connections

正确答案:A

第5题:

The hull is divided up into a number of watertight compartments by ______.

A.inner bottom plating and longitudinals

B.decks and bulkheads

C.double bottom girders

D.topside and hopper tank sloping plating and longitudinals


正确答案:B

第6题:

A tug is to assist in docking an oceangoing vessel on a hawser. The greatest danger to the tug is ______.

A.from the ship's propeller when making up aft

B.from being overrun if making up forward

C.hull damage while alongside passing a hawser

D.getting in a tripping position


正确答案:D

第7题:

In vessel construction,a greater number of watertight bulkheads results in ______.

A.increased capacity to set flooding boundaries

B.decreased capacity to set flooding boundaries

C.reduced compartmentation

D.greater deck load capacity


正确答案:C

第8题:

144 Risk event probability is defined as:

A. the total number of possible events divided into the expectations or frequency of the risk event

B. the number of times the risk event may occur

C. the fraction of the total project tasks which may be affected by the risk event

D. the total number of possible events divided into the consequences of the risk event.

E. A and B


正确答案:A

第9题:

The emphasis of the product perspective on grammar is on the component parts of the language system, divided up into separate forms. Each form is the()of the grammarian’s analysis.
product

第10题:

For painting, the surface of a ship’s hull is divided into ()areas.

  • A、two
  • B、three
  • C、four
  • D、five

正确答案:B

更多相关问题