disconnected
switched off
cut off
connected
第1题:
If you must pump bilges while a vessel is in port,you should pump only ______.
A.If discharge is led to a shore tank or barge
B.During the hours of darkness
C.On the outgoing tide
D.As much as is necessary
第2题:
The equipment required to remove an on-deck oil spill on a barge transfering oil must either be carried on board or ______.
A.on a tug standing by
B.available by contract with the shore facility
C.kept at the shoreside hose connection during transfer
D.kept in a protected shoreside location readily accessible
第3题:
If our captain is not in his cabin, he must be on the(驾驶台)_______.
A.paint locker
B.engine room
C.bridge
D.shore
第4题:
underway
making way
dead in the water
a power driven vessel
第5题:
If our captain is not in his cabin, he must be on the(驾驶台)().
第6题:
The international shore connection required on a ship is designed to ______.
A.Permit discharge of waste oil
B.Allow hook up of fire fighting water from a dock or another vessel
C.Satisfy pollution prevention requirements
D.Allow emergency use of the fire main for deballasting
第7题:
If our captain is not in his cabin, he must be on the ().
第8题:
A large basin cut into the shore,closed off by a caisson,and used for dry docking of ships is known as a ______.
A.slipway
B.graving dock
C.ground warp
D.caisson dock
第9题:
slipway
graving dock
ground warp
caisson dock
第10题:
Certificate of Inspection
List of ship stations
Copy of ship to shore channels
Radio station license