海船船员考试

单选题Free communication will adversely affect transverse stability only when the flooded space is ().A off-centerB on the centerlineC completely floodedD open to the sea above and below the waterline

题目
单选题
Free communication will adversely affect transverse stability only when the flooded space is ().
A

off-center

B

on the centerline

C

completely flooded

D

open to the sea above and below the waterline

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Project Risk _____ .

A should not be calculated for small projects.

B is the probability of each risk event minus the sum of the consequences of potential risk events.

C is the cumulative effect of uncertain occurrences which will adversely affect project objectives.

D cannot be quantified for first time projects.

E B or D


正确答案:C

第2题:

80 A recurring communication pattern within the project organization or company is called a:

A. free-form. matrix

B. structured matrix

C. network

D. rigid channel

E. None of the above


正确答案:C

第3题:

A recurring communication pattern within the project organization or company is called a:

A free-form. matrix

B structured matrix

C network

D rigid channel

E None of the above.


正确答案:C

第4题:

Why are most break bulk vessels built with the transverse framing system rather than the longitudinal system?

A.The transverse system is more resistant to hog and sag stresses

B.The numerous longitudinal frames cause excessive broken stowage

C.The transverse system provides better support to the varying cargo densities on a break bulk vessel.

D.The deep web frames interfere with the stowage of break bulk cargo


正确答案:D

第5题:

When the________is large, the ship is stiff;and when it is small,she is tender.

A.GM

B.Free surface

C.Longitudinal center of gravity

D.transverse center of gravity


正确答案:A

第6题:

4 An informal communication network on a project and within an organization is called a(n):

A. free upward flow

B. free horizontal flow

C. unrestricted communication flow

D. grapevine

E. open network


正确答案:D

第7题:

170 Project Risk _____ .

A. should not be calculated for small projects.

B. is the probability of each risk event minus the sum of the consequences of potential risk events.

C. is the cumulative effect of uncertain occurrences which will adversely affect project objectives.

D. cannot be quantified for first time projects.

E. B or D


正确答案:C

第8题:

An informal communication network on a project and within an organization is called a(n):

A free upward flow

B free horizontal flow

C unrestricted communication flow

D grapevine

E open network


正确答案:D

第9题:

The Chief Mate must ascertain that the deck loads are stowed in such a manner as ______.

A.not to affect the draught trim

B.not to affect the cargo ventilation

C.not to affect the free surface

D.not to affect the vessel's stability


正确答案:D

第10题:

Free communication will adversely affect transverse stability only when the flooded space is ______.

A.off-center

B.on the centerline

C.completely flooded

D.open to the sea above and below the waterline


正确答案:A

更多相关问题