hoisting system only
hoisting system and luffing system
hoisting system and slew and slewing system
slewing system only
第1题:
Which of the following can be used in hydraulic transmission system?
A.Hydraulic oil
B.Animal oil
C.Light oil
D.Fuel oil
第2题:
Which statement is TRUE concerning inert gas systems on tankers ________.
A.Flue gases from the ship's boilers are used in some systems
B.The gas is helium
C.Using the system accelerates the rusting of the tanks
D.All of the above
第3题:
The purpose of systems analysis phase is to build a logical model of the new system. The first step is( ), where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the( ). You use the fact-finding results to build business models, data and process models, and object models. The deliverable for the systems analysis phase is the( ), which describes management and user requirements, costs and benefits, and outlines alternative development strategies. The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase, you need to determine the( ), which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the( ), which is presented to management and users for review and approval.
A.System logical modelingB.use case modelingC.requirements modelingD.application modeling A.systems planning phaseB.systems modeling phaseC.systems analysis phaseD.systems design phase A.system charterB.system scope definitionC.system blueprintD.system requirement document A.application architectureB.system data modelC.system process modelD.implement environment A.system architecture descriptionB.system design specificationC.system technique architectureD.physical deployment architecture
第4题:
第5题:
第6题:
Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set ________.
A.The cranes may be operated independently
B.The cranes may be interconnected for twin operation
C.When twinned,the crane rotation on the foundation assembly is unlimited
D.All of the above
第7题:
During which condition should the operator of a pedestal crane shutdown operations ________.
A.Bunkering barge alongside
B.Potable water spill on deck
C.Crane hydraulic hose bursts
D.Trim greater than 4 feet
第8题:
Which of the following problems may be encountered by using an oil having a viscosity higher than that specified for an operating hydraulic system?
A.External seal leakage
B.Hunting due to fast response
C.Hydraulic oil film breakdown
D.Increased power consumption
第9题:
第10题: