be crossed around the bow
tend out at right angles to the bow
tend aft 60°from each bow
tend forward 30°on either bow
第1题:
The anchor chain should be kept moderately taut during a Mediterranean moor to ______.
A.facilitate speed of recovery during the weighting process
B.indicate the anchor’s location to passing or mooring ships
C.prevent damage to the stern in the event of a headwind
D.provide a steady platform for the gangway between the fantail and pier
第2题:
Which item is the most important factor during deployment of high-availability features?()
第3题:
Historical records during close-out are useful to _____ and _____ for future projects.
A.Predict trends, highlight problems.
B.Analyze successes, shortfalls.
C.Analyze strengths, document results.
D.Support litigation, defend claims.
E.Justify results, set standards.
第4题:
You need to ensure that survey customers are automatically notified when their survey results are available. You must also ensure that customers can manage their own recipient lists. Which two actions should you perform?()
第5题:
Which of the following is the BEST reason to label servers within the server room?()
第6题:
Ships’ masters are requested to ensure that during their call at this port,all discharging outlets are blocked .
A.blockaded
B.opened
C.closed
D.enclosed
第7题:
Why is NTP an important component when implementing IPSec VPN in a PKI environment?()
第8题:
A、volatility
B、situation
C、status
D、stand
第9题:
You work as the exchange administrator at TestKing.com. The TestKing.com network contains anExchange Server 2010 Organization. You are responsible for managing the Exchange network forTestKing.com. You are in the process of deploying an Edge Transport server named TESTKING-EX01 into the organization. During the course of the day you receive an instruction from management to implement amessages hygiene solution. Management wants you to: * Ensure that TESTKING-EX01 blocks e-mails sent to invalid address in the organization. * Ensure that clients receive e-mail from external recipients that is added to their Sage Senders Lists. What should you do?()
第10题:
A Business Partner is proposing the installation an IBM XIV Storage System at a customer location. What is the best time to discuss floor space requirements for the solution()