mooring tension
riser tension
lifesaving equipment
structural strength
第1题:
A load line for a ship is assigned by the ______.
A.Minerals Management Service
B.Department of Energy
C.Corps of Engineers
D.A recognized classification society approved by the Coast Guard
第2题:
The document that certifies the correctness of the load line marks on a ship is called the ______.
A.Certificate of Inspection
B.Load line certificate
C.Certificate of Documentation
D.SOLAS Certificate
第3题:
Compliance with the terms of the load line certificate on a ship is the responsibility of the ______.
A.Ballast Control Operator
B.Barge Supervisor
C.Master or Offshore Installation Manager
D.operators representative
第4题:
18 months
2 years
3 years
5 years
第5题:
stability is positive
neutral equilibrium exists
the load line is not submerged
intact stability curves are valid
第6题:
When must the Master or person in charge of a ship log the position of load line marks in relation to the surface of the water in the logbook?
A.Once a day
B.At the change of every watch
C.Only when in fresh or brackish water
D.Prior to getting underway
第7题:
A load line of a ship is assigned by ______.
A.Minerals Management Service
B.Department of Energy
C.Corps of Engineers
D.A recognized classification society approved
第8题:
Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding ______.
A.18 months
B.2 years
C.3 years
D.5 years
第9题:
the load line becomes submerged
a non-watertight opening is at still water level
offset becomes excessive
reserve buoyancy is a maximum
第10题:
ballast
reserve buoyancy
displacement
rolling periods