海船船员考试

单选题Operation of the valve control release on a fixed CO2 system must immediately().A release CO2 to the protected spaceB secure all mechanical ventilation in the protected spaceC sound the rig's general alarm signal for a fireD sound an alarm in the balla

题目
单选题
Operation of the valve control release on a fixed CO2 system must immediately().
A

release CO2 to the protected space

B

secure all mechanical ventilation in the protected space

C

sound the rig's general alarm signal for a fire

D

sound an alarm in the ballast control room

参考答案和解析
正确答案: B
解析: 暂无解析
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

You must take good care of the drainage cock of the air control system. Because lead scale formed which might malfunctions the pilot control valve and other instruments.

A.the temperature

B.the rust

C.the pressure

D.the humidity


正确答案:D

第2题:

A fixed carbon dioxide extinguishing system for a machinery space,designed WITHOUT a stop valve in the line leading to the protected space,is actuated by ______.

A.one control

B.two controls

C.three controls

D.none of the above


正确答案:A

第3题:

Operation of the valve control release on a fixed CO2 system must immediately ______.

A.release CO2 to the protected space

B.secure all mechanical ventilation in the protected space

C.sound the rig’s general alarm signal for a fire

D.sound an alarm in the ballast control room


正确答案:B
操作固定二氧化碳系统控制阀的释放必须在所保护空间关闭所有机械通风。

第4题:

当中央控制室手动报警站MFS-1301被拉下时,相应的报警描述为()

  • A、CCR STATE LIGHT HAZARDALARM SIREM、PRE-RELEASE BUZZER AND LIGHT、RELEASE TO CO2 PANEL CONTROL RM和ESD 2-2 TO CCP
  • B、CCR STATE LIGHT HAZARDALARM SIREM、PRE-RELEASE BUZZER AND LIGHT、RELEASE TO CO2 PANEL CABINETS RM和ESD 2-2 TO CCP
  • C、CCR STATE LIGHT HAZARDALARM SIREM、PRE-RELEASE BUZZER AND LIGHT、RELEASE TO CO2 PANEL UPS RM和ESD 2-2 TO CCP
  • D、CCR STATE LIGHT HAZARDALARM SIREM、PA HAZARD和ESD 3-A TO CCP

正确答案:A

第5题:

Deep-fat cooking equipment shall be fitted with the following:()

  • A、An automatic or manual fixed extinguishing system tested to an appropriate standardacceptable to the Organization
  • B、Controls for manual operation of the fire-extinguishing system which are clearlylabeled for ready use by the crew
  • C、Arrangements for automatically shutting off the electrical power upon activation of thefire-extinguishing system
  • D、an alarm for indicating operation of the fire-extinguishing system in the galley wherethe equipment is installed

正确答案:A,B,C,D

第6题:

Which describes the operation required to move to anew release level of system firmware?()

A.Deferred

B.Transient

C.Concurrent

D.Disruptive


参考答案:D

第7题:

You are discharging cargo and the inert gas system is in operation to inert the tanks. The pressure in a tank being discharged starts to drop below the allowable limit. What action should you take?

A.Cut in another IG fan to increase gas flow

B.Open the pressure control valve until the pressure increases

C.Open the tank isolation valve to the fully open position

D.Reduce the pumping rate


正确答案:D

第8题:

The CO2 flooding system is actuated by a sequence of steps which are ______.

A.break glass, pull valve, break glass, pull cylinder control

B.sound evacuation alarm, pull handle

C.open bypass valve, break glass, pull handle

D.open stop valve, open control valve, trip alarm


正确答案:A
二氧化碳系统根据步骤序列被打开依次是打碎玻璃,拉阀门,打碎玻璃,拉气瓶控制阀。

第9题:

Which describes the operation required to move to anew release level of system firmware?()

  • A、Deferred
  • B、Transient
  • C、Concurrent
  • D、Disruptive

正确答案:D

第10题:

单选题
Which of the listed pressure control valves would be used to establish the maximum operating pressure of a hydraulic system?()
A

Pressure-reducing valve

B

Unloading valve

C

Counterbalance valve

D

Pressure-relief valve


正确答案: C
解析: 暂无解析

更多相关问题