第1题:
121 Project management/project planning is most closely aligned with:
A. Long range/strategic planning (5 years or more).
B. Intermediate range planning (1 to 5 years)
C. Short range/tactical planning (1 year or less).
D. All of the above.
E. B and C
第2题:
116 Planning activities such that predetermined resource availability pools are not exceeded is called: A. Resource leveling.
B. Manpower leveling.
C. Resource limited planning.
D. Manpower planning.
E. Manpower contingency planning.
第3题:
Project management/project planning is most closely aligned with:
A.Long range/strategic planning ( years or more).
B.Intermediate range planning ( to years)
C.Short range/tactical planning ( year or less).
D.All of the above.
E.B and C.
第4题:
第5题:
People who are entitled to _vote_ (vote) should be over eighteen.
第6题:
此题为判断题(对,错)。
第7题:
A.material requirement planning。
B.management requirement planning。
C.manufacturing resource planning。
D.material revenue planning。
E.Material risk planning。
第8题:
Planning activities such that predetermined resource availability pools are not exceeded is called:
A.Resource leveling.
B.Manpower leveling.
C.Resource limited planning.
D.Manpower planning.
E.Manpower contingency planning.
第9题:
A、 where
B、 which
C、what
D、that
第10题:
A. before-class planning and after-class planning
B. before-class preparation and after-class feedback
C. before-class planning and after-class reflection
D. macro planning and micro planning