The switches are not the same model.
You are not using the correct SFP.
You are not using correct optical media converters.
Configuration should be modified, because the distance is longer.
第1题:
A. Set each end of the trunk line to IEEE 802.1Q encapsulation.
B. Set the same VTP management domain name on both switches.
C. Set all ports on the two switched as access ports.
D. Configure one of the two switches as a VTP server.
E. Connect the two switches using a rollover cable.
F. Use a router to forward VTP traffic between the VLANs.
第2题:
You are deploying two core switches, one in each building, 50 km away from each other. The cross-connection between them will be a Layer 2 2-gigabit EtherChannel with an 802.1Q trunk. You configured it correctly but the link does not come up. The port is in the "admin up" state, and the line protocol is in the "down" state. The fiber link is OK. What would be the most likely reason for the link not to come up? ()
第3题:
A new switch is being installed in the Ezonexam network and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this? (Choose all that apply).
A.You must set each end of the trunk line to IEEE 802.1e encapsulation.
B.You must set the same VTP management domain name on both switches.
C.You must set all ports on the two switches as access ports.
D.You must configure one of the switches as a VTP server.
E.You must use a rollover cable to connect the two switches.
第4题:
You are designing the forest and domain structure to meet the business and technical requirements. Which structure should you use?()
第5题:
To which switch or switches should you provide redundant links in order to achieve high availability with reliable fast convergence in the enterprise campus?()
第6题:
A. to a core switch running Cisco NSF and SSO from redundant distribution switches connected with a Layer 2 link
B. to a core switch running Cisco NSF and SSO from redundant distribution switches connected with a Layer 3 link
C. to two core switches from redundant distribution switches connected with a Layer 2 link
D. to two core switches from redundant distribution switches connected with a Layer 3 link
E. to two core switches running Cisco NSF and SSO from two redundant distribution switches running Cisco NSF and SSO
第7题:
To configure the VLAN trunking protocol to communicate VLAN information between two switches, what two requirements must be met?()
第8题:
A. Review the architectural plans to see how many drops go to each closet.
B. Count the number of rooms near each closet and standardize eight drops per room.
C. Wireless is the new standard and no network switches will be needed in the building,
D. Count the number of phone ports and configure two network ports for each phone port.
第9题:
You are troubleshooting an issue which is causing full-sized packets entering the MPLS cloud be dropped. You have discovered that one of the switches in the MPLS core is not a Cisco switch, but otherwise the MPLS MTU size is set to 1508 bytes on the routers. Based on this information, which of these may be the reason the packets are being dropped?()
第10题:
A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()