A graphics monitor must be attached to the server
Cluster System Management (CSM) software must be installed
The LPAR system must have an Hardware Management Console (HMC) connected
Each LPAR must be configured with a CDROM for operating system installation
第1题:
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
第2题:
Prior to implementing an LPAR system, which of the following needs to be done?()
第3题:
A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy. Which of the following statements correctlydescribes the dual HMC environment? ()
第4题:
Which of the following interfaces is required to implement Workload Partition Mobility? ()
第5题:
An administrator issued a command to update thefirmware of an Ethernet adapter on a partitioned system, but received an error. What is the most likely cause of the problem?()
第6题:
Which of the following can deploy system plans generated by the IBM System Planning Tool (SPT)?()
第7题:
Which of the following statements is true regarding implementing Live Partition Mobility on two existing POWER6 based systems?()
第8题:
A system administrator needs to provision storage for a 200GB database. The database must have extremely low seek time. Which of the following is the BEST solution?()
第9题:
Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()
第10题:
A System p distribution customer is very concerned about Reliability, Availability and Serviceability (RAS). They are planning to install several p6 servers in their facilities and want to be able to move an LPAR from one System p to another. Which of the following would accomplish this()