IBM(000-232)

单选题Prior to implementing an LPAR system, which of the following needs to be done?()A A graphics monitor must be attached to the serverB Cluster System Management (CSM) software must be installedC The LPAR system must have an Hardware Management Console (H

题目
单选题
Prior to implementing an LPAR system, which of the following needs to be done?()
A

A graphics monitor must be attached to the server

B

Cluster System Management (CSM) software must be installed

C

The LPAR system must have an Hardware Management Console (HMC) connected

D

Each LPAR must be configured with a CDROM for operating system installation

参考答案和解析
正确答案: C
解析: 暂无解析
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()

  • A、 Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
  • B、 Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
  • C、 Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
  • D、 Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.

正确答案:D

第2题:

Prior to implementing an LPAR system, which of the following needs to be done?()

  • A、A graphics monitor must be attached to the server
  • B、Cluster System Management (CSM) software must be installed
  • C、The LPAR system must have an Hardware Management Console (HMC) connected
  • D、Each LPAR must be configured with a CDROM for operating system installation

正确答案:C

第3题:

A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy.  Which of the following statements correctlydescribes the dual HMC environment? ()

  • A、 To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.
  • B、 Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.
  • C、 Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on the
  • D、 Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from

正确答案:C

第4题:

Which of the following interfaces is required to implement Workload Partition Mobility? ()

  • A、 Workload Partitions Manager for AIX
  • B、 Hardware Management Console (HMC) GUI
  • C、 Integrated Virtualization Manager (IVM)
  • D、 Advanced System Management Interface (ASMI)

正确答案:A

第5题:

An administrator issued a command to update thefirmware of an Ethernet adapter on a partitioned system, but received an error. What is the most likely cause of the problem?()

  • A、The adapter must be taken offline prior to the firmware update.
  • B、The system has not been rebooted since the adapter was added to the LPAR.
  • C、The adapter must be assigned to the service partition prior to updating the firmware.
  • D、The adapter must be dynamically removed from the LPAR prior to updating thefirmware.

正确答案:A

第6题:

Which of the following can deploy system plans generated by the IBM System Planning Tool (SPT)?()

  • A、 The Hardware Management Console (HMC) and Integrated Virtualization Manager (IVM).
  • B、 The Hardware Management Console (HMC) and Advanced System Manager Interface (ASMI).
  • C、 Integrated Virtualization Manager (IVM) and Advanced System Manager Interface (ASMI).
  • D、 Integrated Virtualization Manager (IVM) and BladeCenter Advanced Management Module (AMM).

正确答案:A

第7题:

Which of the following statements is true regarding implementing Live Partition Mobility on two existing POWER6 based systems?()

  • A、The systems must use internal storage for boot purposes. 
  • B、All virtualized ethernet adapters must be numbered below 10. 
  • C、The mobile partition's network and disk access must be virtualized. 
  • D、Each system must be controlled by a different Hardware Management Console (HMC). 

正确答案:C

第8题:

A system administrator needs to provision storage for a 200GB database. The database must have extremely low seek time. Which of the following is the BEST solution?()

  • A、A JBOD
  • B、A RAID 50 array
  • C、A NAS
  • D、A single SSD

正确答案:D

第9题:

Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()

  • A、Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line. 
  • B、The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed. 
  • C、If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run. 
  • D、The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot. 

正确答案:B

第10题:

A System p distribution customer is very concerned about Reliability, Availability and  Serviceability (RAS). They are planning to install several p6 servers in their facilities and want to be able to move an LPAR from one System p to another.  Which of the following would accomplish this()

  • A、System p servers using similar SAN storage
  • B、System p servers must share an HMC
  • C、System p servers must have the same level HMC
  • D、System p servers with VIOS

正确答案:B

更多相关问题