儿科护理专业实践能力

单选题Construction of a new automobile parts manufacturing facility has recently been completed. Thefacility IT manager wants to deploy voice over WLAN. During your initial walkthrough, you observenumerous highly reflective surfaces on the manufacturing equi

题目
单选题
Construction of a new automobile parts manufacturing facility has recently been completed. Thefacility IT manager wants to deploy voice over WLAN. During your initial walkthrough, you observenumerous highly reflective surfaces on the manufacturing equipment and in the buildingconstruction itself. What potential problem exists that should be accounted for during your sitesurvey?()
A

LOS modulation

B

Multipath distortion

C

RF signal absorption

D

RF signal attenuation

E

Fresnel zone impedance

参考答案和解析
正确答案: A
解析: 暂无解析
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

12 Overlapping activities on a project, such as design and construction, is referred to as:

A. Fast tracking

B. Risk conversion.

C. Parallel management.

D. Process improvement.

E. Synchronous manufacturing


正确答案:A

第2题:

The construction of the new building will cost () 1,000,000 dollars, and it’s not easy to get so much money.

A.at last

B.at most

C.at least

D.at large


参考答案:C

第3题:

Overlapping activities on a project, such as design and construction, is referred to as:

A.Fast tracking

B.Risk conversion.

C.Parallel management.

D.Process improvement.

E.Synchronous manufacturing


正确答案:A
A

第4题:

Our new school building is()construction.

A. under

B. because

C. having


参考答案:A

第5题:

That’s the new machine ______ parts are too small to be seen.

A. that

B. which

C. whose

D. What


正确答案:C
本题考查定语从句的引导词。句意应为“那就是那台零部件小得几乎看不见的新机器。”空格处引导定语从句并且在从句中作定语使用,所以使用whose。

第6题:

146 The five major cost categories of quality are _____ .

A. prevention, appraisal, internal failures, external failures, and equipment (measurement and test). B. specifications, QA programs, QC programs, parts rejected and parts returned

C. Staffing, Training, reviews, equipment and rejected goods

D. sampling, design considerations, manufacturing considerations, training and rework.

E. None of the above


正确答案:A

第7题:

John H Hall played a significant role in developing the “American system of production” in early 19th century-using interchangeable parts for mass manufacturing, which lowered costs and improved efficiency.()

此题为判断题(对,错)。


正确答案:√

第8题:

he five major cost categories of quality are _____ .

A . prevention, appraisal, internal failures, external failures, and equipment (measurement and test).

B . specifications, QA programs, QC programs, parts rejected and parts returned

C . Staffing, Training, reviews, equipment and rejected goods

D . sampling, design considerations, manufacturing considerations, training and rework.

E . None of the above


正确答案:A

第9题:

Blending is a process that creates new words by putting together non-morphemic parts of existing words.Awell-known example is smog (smoke and fog).()


参考答案:正确

第10题:

A global manufacturer of automobile parts wants to implement specialized voice applications to increase productivity and reduce the cost of overseas toll calls. Which Cisco solution best matches this business need?()

A.Digital subscriber line (DSL)

B.Optical network

C.Wireless local-area network (WLAN)

D.Internet Protocol (IP) telephony


参考答案:D

更多相关问题