All filesets for CDE have not been loaded. Boot into maintenance mode and load them through SMIT.
There is a missing device driver, incorrect console configuration, or a serial device plugged into native S1 port.
The new graphics adapter card is marked defined, not available. Rum smit cfgmgr (Install/Configure Devices Added After IPL with the INPUT device /directory for software set to none). This will reconfigure all devices by walking the bus.
The LED C31 means that there is a corrupted /dev/hd5. Boot into maintenance mode, fsck /dev/hd5 and then issue the bosboot command.
第1题:
A system administrator has been instructed to verify that all filesets have all required requisites and are completely installed. Which command will provide this information?()
第2题:
Which of the following could the system administrator use to assist in debugging boot problems after the system is up?()
第3题:
A.Reboot system sing the mkdev -l command.
B.Install device support suing the cfgmgr -i command.
C.Use the SMIT console to redirect the console.
D.Use SMIT devices and choose the correct adapter.
第4题:
An administrator adds a new SATA hard drive into a functional server and attempts to boot the server. The server will no longer boot into the operating system. The administrator checks all the connections and reboots the server. The server still will not load the operating system. Which of the following is the MOST probable cause?()
第5题:
A server technician has been attempting to install an operating system on the company test server for several days. The technician has experienced error messages at several points of theinstallation and the system has frozen during various parts of the boot process. The technician has replaced the power supply, graphics card and installation disk with known good components.Which of the following could be causing these issues?()
第6题:
An administrator has added a new device to a system and wants to determine if it has been correctly added to the ODM database. Which command would the system administrator use?()
第7题:
A graphics card has been added to the system. After rebooting, the system hangs during the login process with a blue screen indicating "CDE please wait". Which of the following procedures should be performed next?()
第8题:
The system administrator did a new install of AIX on a server about a week ago. The system was not rebooted after the installation. CDE is running on this system as is TCPIP. The system administrator has started configuring the system percompany directives. The power cable was inadvertently disconnected from the wall causing the sever to lose power. Upon reboot, the system appears to hang during log in from the console or from Xterminals. Which of the following is the most probable cause?()
A.It is a hardware problem caused by the power failure.
B.There is a network problem, most probably with name resolution.
C.Sine the system was never rebooted, devices are marked defined instead of available and need to be activated.
D.Some filesets may be marked as broken and need to be reinstalled.
第9题:
A blade server has been configured to boot from SAN. After an HBA firmware upgrade the blade was rebooted and cannot find the operating system. Which of the following should the administrator do NEXT to troubleshoot the issue?()
第10题:
A graphics card has been added and the system rebooted. When running the lsdev-Cc adapter, the graphics card is not listed in the output. Which of the following actions should be performed?()