Refresh the RMC daemon using rmcctrl
Refresh the RSCT subsystem using SRC
Recover from script failure using clruncmd
Reconfigure the RSCT subsystem using recfgct
第1题:
While reviewing the backup logs a server administrator notices that a backup job for an application server on the same subnet has failed. Which of the following is MOST likely the problem?()
第2题:
Company.com has non-IBM fibre attached storage. The storage is connected to a node in the cluster that has multiple adapters and virtual paths. There is a concern about detecting the loss of one of the fibre adapters since there is no indication to the administrator that one has failed. What feature of HACMP can be sued to assist with this issue?()
第3题:
Totakeadvantageofthecapabilitiesofmodernbrowsersthatusewebstandards,suchasXHTMLandCSS,yourwebapplicationisbeingconvertedfromsimpleJSPpagestoJSPDocumentformat.However,oneofyourJSPs,/scripts/screenFunctions.jsp,generatesaJavaScriptfile.Thisfileisincludedinseveralwebformstocreatescreen-specificvalidationfunctionsandareincludedinthesepageswiththefollowingstatement:
10.<head>
11.<scriptsrc=‘/scripts/screenFunctions.jsp‘
12.language=‘javascript‘
13.type=‘application/javascript‘></script>
14.</head>
15.<!--bodyofthewebform-->
WhichJSPcodesnippetdeclaresthatthisJSPDocumentisaJavaScriptfile?()
第4题:
A customer who has a two node PowerHA cluster, with each node being at a different site and using cross siteLVM, plans to add a third heartbeat to further reduce the chance of data divergence or partitioned cluster. Theheartbeat will make use of spare adapters in the nodes. However, the heartbeats must go via an externalnetwork requiring static routes to be added for cluster functionality.How can this be achieved?()
第5题:
Company.com has a four-node cluster (nodes ’A’, ’B’, ’C’, and ’D’). The nodes are set up in Resource group pairs. Node ’A’ falls over to Node ’B’, and Node ’C’ falls over to Node ’C’. During a maintenance windows, it was discovered that the six resource groups on Node ’A’ are too much to be adequately handled by Node ’B’. What could be done to better utilize the available resources during fallover?()
第6题:
A cluster node has a failed fibre adapter requiring the node to be halted to replace it. To minimize downtime, what is the appropriate method of performing this repair?()
第7题:
An enterprise has three nodes: -Node ’A’ is a production database, -Node ’B’ is a production Application server, and -Node ’C’ is a test and development node. Node ’C’ is used by six programmers to develop and the production application as business critical and would like to make it highly available with HACMP. Application development and testing is not business critical. Which of the following describes the best solution?()
第8题:
The en0 interface on Node1 of a two-node cluster has failed. This adapter is configured with a boot addressand under stable operations also has the service address of the cluster’s single resource group. The resourcegroup is configured with the fallback option. The HA network was configured for IPAT via aliasing and now theservice address is on the en1 interface in the cluster. The en0 interface has already been physically replacedand configured with the boot address. Which of the following will return the cluster to its original state andminimize cluster downtime?()
第9题:
During initial cluster planning session, a requirement is mandated that application monitoring will Be used to monitor the production database and three application servers. Since all the application servers rely on the database being active, only one resource group has been planned to manage the starting/stopping of the cluster resources. How ill the initial design impact the use of application monitoring?()
第10题:
A cluster administrator has decided to add a cluster verification to the weekly maintenance scripts That are run from corn. When a cluster verification is performed,which of the following will require a custom verification method?()