IBM(000-118)

单选题A customer has two locations located 7 kilometers apart. The production site has a Cisco 9509chassis with 48 Fibre Channel ports activated, and the disaster recovery site has a Cisco 9509chassis with 48 Ethernet ports activated. Which of the following 

题目
单选题
A customer has two locations located 7 kilometers apart. The production site has a Cisco 9509chassis with 48 Fibre Channel ports activated, and the disaster recovery site has a Cisco 9509chassis with 48 Ethernet ports activated. Which of the following products will be used to get thedata from one location to the other?()
A

IBM SAN40-B4

B

Cisco MDS 9222i

C

Cisco MDS 9148

D

IBM SAN32B-E4 with encryption

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance.Which of the following products best accomplishes this task?()

A. Global Copy

B. Metro Mirror

C. Global Mirror

D. Metro/Global Mirror


参考答案:C

第2题:

A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated.  The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage.  Each system has the following: ? 2 integrated network ports ?   2 fibre channel adapter cards   ? 1 power supply and redundant cooling   ? HACMP v5.1   In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()

  • A、One fibre channel switch
  • B、Two fibre channel switches
  • C、Two Ethernet cards
  • D、Nothing

正确答案:B

第3题:

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()

A. operator training

B. cache size of the two clusters

C. fibre bandwidth capability between the sites

D. number of stacked tape drives attached to each cluster


参考答案:C

第4题:

A customer has installed an IBM System Storage DS8700 with 20 TB of storage, two-way processor version, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues.  To address this performance consideration with minimal cost to the customer, which of the following should be the FIRST step to resolve the problem()

  • A、add an expansion frame with additionalFibre Channel ports
  • B、increase the amount of storage by 20 TB
  • C、conduct a Disk Magic study to identify the source of the performance issue
  • D、add additionalFibre Channel ports to the existing DS8700

正确答案:C

第5题:

A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()

  • A、VLAN
  • B、zoning
  • C、trunking
  • D、LUN masking

正确答案:B

第6题:

A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()

A.VLAN

B.zoning

C.trunking

D.LUN masking


参考答案:B

第7题:

A customer has four AIX partitions that require a SAN. The disk subsystem must replicate to aremote site via an IP network. Each site has two Cisco MDS 9509 directors with fibre channel linecards. Which of the following must be added to each director to meet the IP requirement?()

  • A、tri-rate SFP
  • B、update to the latest Cisco IOS
  • C、FCIP activation on the existing 16 FC line cards
  • D、Multiprotocol Services Module with FCIP activation

正确答案:D

第8题:

A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites.Which of the following solutions satisfies the customer‘s recovery time objective?()

A. DS8700 systems at each site running Metro Mirror

B. DS5300 systems at each site running Metro Mirror

C. DS5100 systems at each site running Global Mirror

D. XIV systems at each site running synchronous mirroring


参考答案:A

第9题:

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()

  • A、operator training
  • B、cache size of the two clusters
  • C、fibre bandwidth capability between the sites
  • D、number of stacked tape drives attached to each cluster

正确答案:C

第10题:

A customer has two sites located 500 kilometers apart. The customer has both a high-speedInternet link and dark fiber between the sites. The customer wants to utilize storage resources ateither site leveraging replication for disaster recovery implementations. The customer wants to linkthese two sites together. Which option provides the highest performance and is most reliable?()

  • A、iFCP router
  • B、FCIP router
  • C、DWDM and CWDM
  • D、LC multi-mode 50 micron fiber

正确答案:C

更多相关问题