IBM(000-118)

单选题A customer has an existing DS5300 system attached to two Brocade switches with eight Windowsservers. The customer wants to add their System i p750 server to this SAN. From the followingchoices what is the simplest and least expensive solution for this 

题目
单选题
A customer has an existing DS5300 system attached to two Brocade switches with eight Windowsservers. The customer wants to add their System i p750 server to this SAN. From the followingchoices what is the simplest and least expensive solution for this customer?()
A

add twofibre HBAs to the System i and connect to the SAN

B

add twofibre HBAs to the System i and connect to the Windows Servers

C

add twofibre HBAs to the System i and connect to the System i using VIOS

D

add two SAS HBAs to the Systemi array and connect directly to the DS5300

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A client has requested an IBM System x solution. Pricing is the most sensitive decision factor. They are looking for 12 TB of storage, with a projected growth of 10-15%. As this is the only server accessing this amount of data, the customer does not require a SAN.  What should the System x Sales Specialist recommend?()

  • A、A DS3000 iSCSI-based solution.
  • B、One MegaRAID 8480 card with 4 EXP3000 units.
  • C、An N3700 network attached solution.
  • D、A DS6000 Fibre Channel solution with EXP710 expansion units.

正确答案:B

第2题:

A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()

  • A、 Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
  • B、 Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
  • C、 Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
  • D、 Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.

正确答案:D

第3题:

A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()

A. z/OS, DS8000, TSM

B. TSM, LTO-5, VMware

C. System x, VMware, XIV

D. System p, VMware, DS5000


参考答案:C

第4题:

A customer wants to migrate from McData-based fabrics to native Brocade fabrics. A Brocadedirector in the McData interop mode of operations has already been added to the fabrics, and thedevices moved from McData switches to the Brocade director. The customer is now ready toremove the McData switches from the fabrics and change the Brocade director to native mode ofoperations. What product is needed to migrate the zoning configuration to the Brocade director?()

  • A、TPC
  • B、TSM
  • C、DCFM
  • D、Fabric Watch

正确答案:C

第5题:

The customer is looking for a tiered storage solution that allows them to manage different types ofdata within the same system. Further questioning reveals that the reason the customer wants amulti-tiered environment is based on cost. Which IBM single tier solution can provide an enterpriselevel system at a midrange cost?()

  • A、XIV system 
  • B、TS3500 
  • C、DS8700 
  • D、DS5300

正确答案:A

第6题:

A customer wants to consolidate storage from four IBM System p servers and one large IBM System i server. The customer does not have a SAN installed. The customer will require approximately 4 TB for System p and 3 TB for System i. The customer states that performance and isolation of the System i system is most important. Capacity, multi-path access, and replication functions are important for the System p servers.    Which solution best satisfies the customer requirements()

  • A、IBM System Storage DS8100 with 300 GB drives for the System p, 73 GB/15k drives for System i, and advanced functions for System p capacity
  • B、IBM System Storage DS8300 with LPAR, 73 GB/15k drives for System i, and 300 GB drives and advanced functions for System p capacity
  • C、IBM System Storage DS6800 with direct attach, 73 GB/15k drives for System i performance, and 300 GB drives and advanced functions for System p
  • D、IBM System Storage DS6800 with LPAR, 146 GB/15k drives for System i, 500 GB FATA drives for System p

正确答案:B

第7题:

A customer has an existing DS5300 system attached to two Brocade switches with eight Windowsservers. The customer wants to add their System i p750 server to this SAN. From the followingchoices what is the simplest and least expensive solution for this customer?()

  • A、add twofibre HBAs to the System i and connect to the SAN
  • B、add twofibre HBAs to the System i and connect to the Windows Servers
  • C、add twofibre HBAs to the System i and connect to the System i using VIOS
  • D、add two SAS HBAs to the Systemi array and connect directly to the DS5300

正确答案:A

第8题:

An SMB customer requires a tower server with 2TB of internal storage. The customer has requested a low cost solution.  What IBM System x server would satisfy this criteria?()

  • A、x3250
  • B、x3200
  • C、x3650
  • D、x3400

正确答案:B

第9题:

A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()

  • A、z/OS, DS8000, TSM
  • B、TSM, LTO-5, VMware
  • C、System x, VMware, XIV
  • D、System p, VMware, DS5000

正确答案:C

第10题:

A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()

  • A、Configure a 2 node x3950 X5 
  • B、Customer needs a System p server to support Oracle applications 
  • C、Download the Oracle eBusiness sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing 
  • D、Configure a system that meets the minimum requirements

正确答案:C

更多相关问题