第1题:
Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()
第2题:
A customer wishes to replace 12 older small UNIX systems. They are running out of floor space in their data center and any solution must take this into consideration. Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()
第3题:
In addition to a POWER5 system and an HMC, what else is required to enable Micro-Partitions in an AIX environment?()
第4题:
Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()
第5题:
A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications. The pSeries technical specialist should recommend purchasing which of the following?()
第6题:
During implementation of a two-node cluster,it is determined that error notification for the shared Disk subsystem would be beneficial. Which of the following is a pre-requisite for implementing automatic error notification?()
第7题:
Which of the following is required to use Simultaneous Multi-Threading (SMT)?()
第8题:
An administrator is implementing a second server due to the increased usage. Which of the following optimization techniques is the administrator using?()
第9题:
An IT director is eager to adopt POWER7 servers because of their relative performance ratings and energy efficiency, but is concerned about migrating applications which require AIX 5.3. Which of the following will address his concern?()
第10题:
Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()