IBM(000-223)

单选题A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS.  Which of the following must be completed prior to this migration ()A Upgrade system firmware to latest levelB Upg

题目
单选题
A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS.  Which of the following must be completed prior to this migration ()
A

Upgrade system firmware to latest level

B

Upgrade to AIX 5.3

C

Upgrade HMC to version 6.1

D

Convert rootvg filesystems to JFS2

参考答案和解析
正确答案: B
解析: 暂无解析
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A system administrator completed an upgrade of the maintenance level of their AIX system. Which of the following commands should be run to verify that the operating system is in a consistent state?()

  • A、instfix -i
  • B、lslpp -l
  • C、lppchk -v
  • D、oslevel -r

正确答案:C

第2题:

Prior to implementing an LPAR system, which of the following needs to be done?()

  • A、A graphics monitor must be attached to the server
  • B、Cluster System Management (CSM) software must be installed
  • C、The LPAR system must have an Hardware Management Console (HMC) connected
  • D、Each LPAR must be configured with a CDROM for operating system installation

正确答案:C

第3题:

A System p administrator plans to install a new system with AIX 5.3 TL5 using a NIM server.  Which of the following provide post install diagnostics()

  • A、SPOT
  • B、lpp_source
  • C、mksysb
  • D、install CD

正确答案:A

第4题:

An administrator issued a command to update thefirmware of an Ethernet adapter on a partitioned system, but received an error. What is the most likely cause of the problem?()

  • A、The adapter must be taken offline prior to the firmware update.
  • B、The system has not been rebooted since the adapter was added to the LPAR.
  • C、The adapter must be assigned to the service partition prior to updating the firmware.
  • D、The adapter must be dynamically removed from the LPAR prior to updating thefirmware.

正确答案:A

第5题:

A production system needs to be upgraded from AIX V5.2 to AIX V5.3. All system logs and users need to be saved.  Which installation method will accomplish the upgrade()

  • A、Update Installation
  • B、Migration Installation
  • C、Preservation Installation
  • D、Mirror rootvg prior to a Preservation Installation

正确答案:B

第6题:

A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()

  • A、ITSO Redbooks
  • B、Facts and Features
  • C、System Planning Tool
  • D、Fix Level Recommendation Tool

正确答案:D

第7题:

A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory.  The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2.  They will have a short outage window to perform the data migration.  What is the quickest way to move all the data stored on the attached ESS from the p670 to the new p5-570?()

  • A、Use rsync to synchronize the data across servers.
  • B、Use exportvg and importvg to move the data to the target system.
  • C、Use NFS to copy the data from the source system to the target system.
  • D、Backup the data from the source system and restore to the target system.

正确答案:B

第8题:

A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()

  • A、 Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
  • B、 Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
  • C、 Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
  • D、 Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.

正确答案:D

第9题:

A system administrator has just finished upgrading a system to AIX 5.2. If there are future problems, the system administrator would like to add an entry to the AIX errorlog to record this event. Which of the following commands can be issued for this purpose?()

  • A、/usr/bin/errmsg "System upgraded to AIX 5.2"
  • B、/usr/bin/errlog "System upgraded to AIX 5.2"
  • C、/usr/bin/errupdate "System upgraded to AIX 5.2"
  • D、/usr/bin/errlogger "System upgraded to AIX 5.2"

正确答案:D

第10题:

A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future.  Which pSeries system would be positioned best to meet this customer’s requirements?()

  • A、p5-550 with the Advanced POWER Virtualization feature and AIX 5.2
  • B、p5-550 with the POWER5 processor technology and AIX 5.2
  • C、p5-570 with the Advanced POWER Virtualization feature and AIX 5.3
  • D、p5-570 with the POWER5 processor technology and AIX 5.2

正确答案:D

更多相关问题