Verification of the expected performance of the new solution.
A document used by IBM manufacturing to build and ship the system solution.
An IBM Quality Assurance Certificate which is supplied to the customer with the system.
A list of actions that are recommended to reduce risk and create a successful implementation.
第1题:
列车技术检查站 train technical inspection station
第2题:
A customer recently installed new a SAN with an IBM System Storage DS8700 and several open systems servers to address a need for storage consolidation and still provide good response time. They have asked the Business Partner technical representative for the most complete IBM product that would allow them to do performance reporting of the new SAN environment. What is the best solution()
第3题:
The storage specialist has designed a very complex solution with the customer, and needs toverify that all associated equipment will work as expected. Which of the following is designed tohelp lower support cost and improve customer satisfaction?()
第4题:
What is the primary purpose of the Technical and Delivery Assessment (TDA)?()
第5题:
A customer recently installed new SAN with an IBM System Storage DS8300 and several open systems servers to address a need for storage consolidation and still provide good response time. They have asked the Business Partner technical representative for the most complete IBM product that would allow them to do performance reporting of the new SAN environment. What is the best solution()
第6题:
After visiting several customers, the pSeries technical specialist returns to the office late in the day and makes a list of the various customer requests. The specialist decided to complete at least one task before leaving for the day. Which of the following is most important to complete immediately?()
第7题:
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()
第8题:
Which of the following statements best describes a Pre-sales Solution Assurance Review?()
第9题:
When performing an expert level pre-install Technical & Delivery Assessment (TDA), which team member has the responsibility for assigning, tracking and updating the completion of action items during the TDA process?()
第10题:
A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()