IBM(000-106)

单选题A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition. They need to add a GX++ adapter and cable

题目
单选题
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition. They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()
A

A second IVE adapter

B

A second processor card

C

PowerVM Enterprise Edition

D

An additional cable-management arm

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer has a requirement to eliminate single points of failure for an application.  They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()

  • A、Etherchannel and trunking
  • B、Network Interface Backup and Etherchannel
  • C、Shared Ethernet Adapter (SEA) Failover and Etherchannel
  • D、Network Interface Backup and Shared Ethernet Adapter failover

正确答案:D

第2题:

A customer wants to increase the performance of an existing server. They are running a very network intensive application and feel that increasing the bandwidth to the network will fix their problem.  They are running two 24-port autosensing 10/100 hubs, tied together with a standard Ethernet crossover cable in port 24.  The server is running IPX. After adding a second network card and plugging one card into each hub, they have not seen any performance improvement.  Which two are likely reasons why implementing network adapter teaming has not improved performance?()

  • A、 Adapter teaming is designed to work with switches.
  • B、 Adapter teaming only functions with gigabit network cards.
  • C、 Adapter teaming only provides fault tolerance, not additional bandwidth.
  • D、 Adapter teaming only works with IPX when using switches and network cards with special features that support teaming.

正确答案:A,D

第3题:

A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimum configuration which will support this?()

  • A、One processor card and one GX+ expansion card
  • B、Two processor cards and one GX++ expansion card
  • C、One processor card, one GX+ expansion card, and one GX++ expansion card
  • D、Two processor cards, one GX+ expansion card, and one GX++ expansion card

正确答案:C

第4题:

When using a mksysb and base media to clone a system, which of the following will cause the installation to fail()

  • A、mksysb made on a single processor machine but is being installed on a multiple processor machine, no editing of the image.data file
  • B、mksysb made on machine with mirrored rootvg and new machine only has one disk in rootvg, no editing of the image.data file
  • C、mksysb made on a machine with 32GB of RAM but being installed on a machine with only 8GB of RAM
  • D、mksysb made on a machine with virtual Ethernet adapter but being installed on a machine which only has a physical Ethernet adapter

正确答案:B

第5题:

A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance. Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()

  • A、Order a 2-port 1Gbps Ethernet LAN adapter.
  • B、Order a 2-port 10Gbps Ethernet LAN adapter.
  • C、Upgrade the IVE adapter to a 4-port 1Gbps IVE adapter.
  • D、Upgrade the IVE adapter to a 2-port 10Gbps IVE adapter.

正确答案:A

第6题:

What is the minimum hardware configuration of the multishelf Cisco CRS- 1 system?()

  • A、one route processor (RP) Card and one modular services card (MSC)
  • B、one distributed route processor (DRP) and one S13 fabric card (SFC)
  • C、one line card chassis (LCC) and one fabric card chassis (FCC)
  • D、one route processor (RP) and one fabric card chassis (FCC)
  • E、one line card chassis (LCC) and one S13 fabric card (SFC)

正确答案:C

第7题:

A customer is planning on having a single Virtual I/O Server (VIOS) configuration in a Power 750. They haveselected a 4-port 1Gb Integrated Virtual Ethernet (IVE). There will be no other network cards installed in the system. One IVE logical port will be used in the VIO Server and will be used as the physicalport in a Shared Ethernet Adapter (SEA). What is the maximum number of IVE logical ports available to use inother LPARs?()

  • A、1
  • B、7
  • C、15
  • D、31

正确答案:D

第8题:

A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition. They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()

  • A、A second IVE adapter
  • B、A second processor card
  • C、PowerVM Enterprise Edition
  • D、An additional cable-management arm

正确答案:B

第9题:

A customer’s new rack contains 12 x p655 servers.   The customer currently has an HMC with one 128-port async adapter with a rack mounted 16-port RAN. The HMC is already attached to two pSeries p630s.  What upgrades, if any, are needed to the HMC to support the new p655 servers?()

  • A、No upgrades are needed.
  • B、Add another 16-port RAN.
  • C、Add an 8-port async adapter.
  • D、Add an additional 128-port adapter.

正确答案:C

第10题:

What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()

  • A、The new system requires 1 installed processor card for the GX++ bus adapter
  • B、The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter
  • C、The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter
  • D、The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand  cluster adapter

正确答案:B

更多相关问题